User Manual SIPLACE S-25 HM 1 Introduction, technical data Software Vers ion SR.503.xx 04/2002 US Edition 1.10 Setting up the plac ement system 29 1.10 Setting up the placement syste m 1.10.1 T ransport dimensions 1 Fig.…

1 Introduction, technical data User Manual SIPLACE S-25 HM
1.9 Dimensions and weight of the placement system Software Version SR.503.xx 04/2002 US Edition
28
1.9.3 The placement system’s center of gravity
1
Fig. 1.9 - 2 The placement system’s center of gravity
X coordinate -80 mm 1
Y coordinate 0 mm 1
Z coordinate 350 mm high 1
T PCB transport direction 1
1
These center of gravity coordinates relate to placement systems with a PCB transport height of
830 mm. 1

User Manual SIPLACE S-25 HM 1 Introduction, technical data
Software Version SR.503.xx 04/2002 US Edition 1.10 Setting up the placement system
29
1.10 Setting up the placement system
1.10.1 Transport dimensions
1
Fig. 1.10 - 1 Dimensions of the placement system during transportation and setting up
(A) Points for attaching the fork-lift truck (fork length 1600 mm) 1
(1) Input conveyor
(2) Output conveyor
1
The standard PCB conveyor height is 830 mm ±15 mm. The standard overall height of the
machine is 1836 mm. For a PCB conveyor height of 950 mm (SMEMA option), this gives an
overall height of 1956 mm.
1 Introduction, technical data User Manual SIPLACE S-25 HM
1.10 Setting up the placement system Software Version SR.503.xx 04/2002 US Edition
30
1.10.2 Transport configuration and transportation
The following components are not installed when the placement system is delivered from the fac-
tory: 1
– keyboards
–monitors
– fault indicator lamps and
– component tables
Æ Install the dismantled components for commissioning.
Æ Use a fork-lift truck to transport the placement system with a minimum fork length of 1600 mm.
Æ Attach the fork-lift truck only at the indicated points.
1.10.3 Quality of the foundation
Æ Ensure that
– you set up the placement system on a firm and non-vibrating foundation.
– the load bearing capacity per unit area of the foundation is greater than 1000 kg/m².
1.10.4 Compressed air supply
– The pressure of the compressed air supply must be 5.5 bar min
(max. permissible value 8 bars).
– The compressed air must conform to the above specification.
This can be achieved with 1
– oil-free compressors, e.g. Atlas, Copco type ZR4
– compressed air washer/driers
– micro-filters, series X, e.g. from Zander
1.10.5 Power supply
– The power socket must be fused with the following fuse ratings:
3 x 16 A for 3 x 400 VAC / 3 x 208 VAC 1