00193463-01.pdf - 第30页

1 Introduction, technical data User Manual SIPLACE S -25 HM 1.10 Setting up the placement system Software Version SR.503.xx 04/2002 US Edition 30 1.10.2 T ransport configuration and transport a tion The following compone…

100%1 / 226
User Manual SIPLACE S-25 HM 1 Introduction, technical data
Software Version SR.503.xx 04/2002 US Edition 1.10 Setting up the placement system
29
1.10 Setting up the placement system
1.10.1 Transport dimensions
1
Fig. 1.10 - 1 Dimensions of the placement system during transportation and setting up
(A) Points for attaching the fork-lift truck (fork length 1600 mm) 1
(1) Input conveyor
(2) Output conveyor
1
The standard PCB conveyor height is 830 mm ±15 mm. The standard overall height of the
machine is 1836 mm. For a PCB conveyor height of 950 mm (SMEMA option), this gives an
overall height of 1956 mm.
1 Introduction, technical data User Manual SIPLACE S-25 HM
1.10 Setting up the placement system Software Version SR.503.xx 04/2002 US Edition
30
1.10.2 Transport configuration and transportation
The following components are not installed when the placement system is delivered from the fac-
tory: 1
keyboards
–monitors
fault indicator lamps and
component tables
Æ Install the dismantled components for commissioning.
Æ Use a fork-lift truck to transport the placement system with a minimum fork length of 1600 mm.
Æ Attach the fork-lift truck only at the indicated points.
1.10.3 Quality of the foundation
Æ Ensure that
you set up the placement system on a firm and non-vibrating foundation.
the load bearing capacity per unit area of the foundation is greater than 1000 kg/m².
1.10.4 Compressed air supply
The pressure of the compressed air supply must be 5.5 bar min
(max. permissible value 8 bars).
The compressed air must conform to the above specification.
This can be achieved with 1
oil-free compressors, e.g. Atlas, Copco type ZR4
compressed air washer/driers
micro-filters, series X, e.g. from Zander
1.10.5 Power supply
The power socket must be fused with the following fuse ratings:
3 x 16 A for 3 x 400 VAC / 3 x 208 VAC 1
User Manual SIPLACE S-25 HM 1 Introduction, technical data
Software Version SR.503.xx 04/2002 US Edition 1.10 Setting up the placement system
31
1.10.6 Setting up the placement system
Æ Raise the placement system using the fork-lift truck and adjust the feet until there is a gap of
830 mm between the top edge of the PCB conveyors and the bottom edge of the feet.
Æ Leave a gap of 1 to 3 mm between the PCB conveyors of the placement system.
Æ Use a cord pulled tight to ensure that all the placement systems are exactly in line with one
another.
Æ Adjust each placement system using a spirit level with an accuracy of 0.02 mm/m.
Æ Lock the feet in position.
Æ Check the placement system again using the spirit level and correct the settings, if necessary.
CAUTION
Make sure that you remove all the shipping braces from the placement system. 1
Æ Fit any components that were dismantled for dispatch.
Æ Connect all the electrical and pneumatic lines.
RISK OF DEATH
The electrical connection work MUST be carried out only by appropriately trained and certi-
fied personnel. 1