YSM40 Mainte_E.pdf - 第33页

    1    1 5.1.1 Cleaning the spline shaft 3-4 1 5.2 HS head 3-4 3 5.2.1 Cleaning and lubricating the ball cage and main shaft 3-4 3 5.2.2 Cleaning and lubricating the scissors g…

100%1 / 160
Chapter 3 Periodic maintenance items
1. Weekly inspection 3-1
1.1 Nozzle inspection 3-1
1.1.1 Buffing area inspection 3-1
1.1.2 Checking the nozzle leaf spring condition 3-2
1.1.3 Replacing nozzle leaf springs 3-3
1.2 Nozzle cleaning 3-8
1.2.1 Cleaning the nozzle buffing area 3-8
1.2.2 Cleaning the nozzle air path (monthly) 3-9
1.2.3 Cleaning the nozzle tip 3-10
1.3 Cleaning the multi-camera lighting's protective cover 3-11
  2
2.1 Rotary unit 3-13
2.1.1 Cleaning the rotary unit 3-13
2.1.2 Cleaning the rotary unit collectively (ultrasonic cleaning) 3-16
2.2 X-axis 3-19
2.2.1 Cleaning and greasing the X-axis ball screw (4-beam type) 3-19
2.2.2 Cleaning and greasing the X-axis ball screw (2-beam type) 3-21
2.2.3 Cleaning and lubricating the X-axis guide (4-beam type) 3-23
2.2.4 Cleaning and lubricating the X-axis guide (2-beam type) 3-25
  7
2.3.1 Cleaning and lubricating the Y-axis guide (4-beam type) 3-27
2.3.2 Cleaning and lubricating the Y-axis guide (2-beam type) 3-29
  0
2.4.1 Board sensors 3-30
2.4.2 Feeder lift sensor 3-30
3. Three-month inspection 3-31
  1
3.1.1 Cleaning and replacing the air filter 3-31
3.2 HS head 3-32
3.2.1 Cleaning and replacing the air filter 3-32
  3
3.3.1 Cleaning and replacing the air filter 3-33
3.3.2 Cleaning and lubricating the spline shaft 3-34
3.3.3 Cleaning and lubricating the ball screw 3-34
3.4 Air intake fan filter 3-35
3.4.1 Cleaning the filters 3-36
4. Six-month inspection 3-37
4.1 Cleaning the camera lighting unit 3-37
4.1.1 Fiducial camera 3-37
4.1.2 Multi-camera 3-38
4.1.3 Side-view camera (multi-camera installed type) 3-39
4.1.4 Side-view camera (HS head) 3-40
  1
  1
5.1.1 Cleaning the spline shaft 3-41
5.2 HS head 3-43
5.2.1 Cleaning and lubricating the ball cage and main shaft 3-43
5.2.2 Cleaning and lubricating the scissors gears 3-44
5.2.3 Cleaning and lubricating the clutch and hook 3-45
5.2.4 Cleaning the switching valve gasket 3-46
  7
5.3.1 Cleaning the spline shaft 3-47
5.3.2 Cleaning and lubricating the scissors gear 3-48
5.4 Conveyor 3-49
5.4.1 Inspecting the conveyor belt and cleaning the guides 3-49
5.4.2 Cleaning and greasing the hexagon spline 3-51
5.5 W-axis 3-52
5.5.1 Cleaning and lubricating the W-axis ball screw 3-52
5.5.2 Cleaning and lubricating the W-axis guide 3-53
5.6 PU axis 3-54
5.6.1 Cleaning and lubricating the PU axis ball screw 3-54
5.7 Controller 3-55
5.7.1 Cleaning the filter 3-55
  6
5.8.1 Cleaning the filter and cup 3-56
Chapter 4
Long-term inspection and other maintenance
  1
  1
  2
2.1 Replacing the blow station filter 4-2
2.2 UPS battery 4-3
3.
 4
  5
3.1.1 AZ axis 4-5
3.1.2 Both sides of cATS 4-5
3.2 6-month inspection 4-6
3.2.1 AH axis 4-6
3.2.2 Magazine shaft 4-6
3.2.3 Pickup station (pallet clamp) 4-7
3.2.4 Pickup station (vertical guide) 4-7
  8
4.1 Removing the pumps and making preparations 4-9
  0
4.2.1 Removing the head cover and cylinder 4-10
4.2.2 Removing the pressing plate and cup packing 4-12
4.2.3 Removing the cylinder parts 4-12
4.3 Reinstalling the replacement parts 4-13
4.3.1 Reinstalling the cup packing and pressing plate 4-13
4.3.2 Reinstalling the cylinder parts 4-13
4.3.3 Reassembling the head cover 4-14
Chapter 5 Lubrication points and schedule
1. Lubrication preparations 5-1
1.1 Compatible grease 5-1
1.2 Grease gun 5-1
2.
 2
2.1 X-axis 5-2
2.1.1 4-beam type 5-2
2.1.2 2-beam type 5-3
  4
2.2.1 4-beam type 5-4
2.2.2 2-beam type 5-5
2.3 W-axis 5-6
2.4 PU-axis 5-7
2.5 Head unit 5-8
2.5.1 HS head 5-8
2.5.2 FL head 5-9
  0
  0
3.2 AH-axis 5-11
3.3 Pickup station and others 5-12
  3
Appendix
1. Specifications A-1
1.1 Air regulator unit A-1
1.2 Power connection terminals A-2
1.3 Connection between machines A-3
1.3.1 PREVIOUS INTERFACE connector A-3
1.3.2 NEXT INTERFACE connector A-4
2. Warranty A-5