User Manual SIPLACE Head Care Station -.pdf - 第55页

5 Working with the HCS 5.2 Head verification process User Manual SIPLACE Head Care Station 10/2017 55 NOTICE Calibration nozzle For the head verification, the head must be equipped with calibration nozzles. Fig.45: Inse…

100%1 / 76
5 Working with the HCS
5.2 Head verification process
54 User Manual SIPLACE Head Care Station 10/2017
5.2 Head verification process
For a typical head verification, the following steps need to be performed:
5.2.1 "Setting up the heads" [}54]
5.2.2 "Switching on the HCS" [}61]
5.2.3 "Starting the HCS software" [}62]
5.2.4 "Changing the user role" [}64]
5.2.5 "Check / adjust the force sensor reference voltage" [}64]
5.2.6 "Verifying a head" [}66]
5.2.1 Setting up the heads
This chapter describes how to set up a placement head at the HCS head unit.
DANGER
Checking for absence of voltage!
Before you start working, switch off the main power switch at the control box to ensure
the absence of voltage!
5.2.1.1 Setting up C&P20x and CPP heads
As the assembly is almost identical for a C&P20x or a CPP head, the description was made on the
example of the C&P20P head pointing out the differences in the appropriate places.
Fig.44: C&P20P head mounted at the HCS
1 Hose for compressed air supply to head 2 Hose for vacuum supply
3 Exhaust air hose 4 Hose for compressed air supply to PRV
5 Placement head with calibration nozzles
and component camera
6 Stopper for CP20x and CPP heads
7 Flat ribbon cable connecting head inter-
face and head adapter
8 Camera cables for hotlink connection
9 Flat ribbon cable to the head interface
5 Working with the HCS
5.2 Head verification process
User Manual SIPLACE Head Care Station 10/2017 55
NOTICE
Calibration nozzle
For the head verification, the head must be equipped with calibration nozzles.
Fig.45: Inserting the stopper
Insert the correct stopper(1).
 NOTICE!
The tool clamping(2) has two different ver-
sions: The new tool locking using a spring,
the former tool locking using a screw.
.
Fig.46: Mounting the head
Fasten the screws to the head mounting
board(1) with a torque of 2.7Nm.
 NOTICE!
The screw holes to be used for the various
heads are indicated on the board.
.
Fig.47: Connecting the cables
Connections at the front:
Connect the flat ribbon cable(2) to the board ad-
apter head interface(1).
Connect the camera cables(3) to the respective
camera interface (4).
5 Working with the HCS
5.2 Head verification process
56 User Manual SIPLACE Head Care Station 10/2017
Fig.48: Removing the cover
Connections at the back:
Grab the knob(1) and pull the protective
cover(2) with the actuator(3) upwards out of the
safety switch(4).
Fig.49: Connecting the flat ribbon cablesr
Connect the flat ribbon cables(3) of the Board
Adapter-LP C700B-HCSII[03087842-xx](1) to
the Board Adapter-LP CPP/CP20-HC-
SII[03087843-xx](2).
Fig.50: Setting the voltage
For C&P20x heads, set the switch(1) to 40V.
For CPP heads, set the switch(1) to 150V.