STM1-S_SDV_Maintenance(Eng_Ver1).pdf - 第26页

Chap ter 2 Inspe ction It ems fo r Main t e nanc e Multi -Func tional Placer ST M1-S M ain ten an ce Ha nd bo ok 2-5 Monthly Inspections (1/2) Che ck-up List Rep la cement Time Referen ce Time requ ired Per iod No Inspec…

100%1 / 84
Chapter 2
Inspection Items for Maintenance
Multi-Functional Placer
STM1-S Maintenance Handbook
2-4
Weekly Inspections
Inspection Items for Maintenance
Chapter 2
Inspection Items for Maintenance
Multi-Functional Placer
STM1-S Maintenance Handbook
2-5
Monthly Inspections (1/2)
Check-up List
Replacement
Time
Reference
Time
required
Period No Inspection Item Measures Tools
Monthly
M-1 Head Spindle Clean Air gun, cloth 30 Minutes
M-2 Conveyor Sensor Inspect and clean Cotton swab, cloth 10 Minutes
M-3 Cover Cooling Fan Inspect and clean
Crosshead screwdriver,
vacuum cleaner
10 Minutes
M-4 Cover Cooling Fan Filter Replace Vacuum cleaner 6months 15 Minutes
M-5 Head LM Guide, Ball Spline Clean and apply grease Brush, cloth
Apply grease period:
3 months
30 Minutes
Setting the replacement period for parts
Based on the regulated use environment.
If the use environment is poor, the intervals for part inspection and replacement can be shortened.
In the above table, C/S means our designated C/S company (STS) or our overseas local agents.
Monthly Inspections (1/2)
Chapter 2
Inspection Items for Maintenance
Multi-Functional Placer
STM1-S Maintenance Handbook
2-6
Monthly Inspections (1/2)
Inspection Items for Maintenance