STM1-S_SDV_Maintenance(Eng_Ver1).pdf - 第79页
Y e ar ly Inspe ction and Appe ndix Chap ter 6 Multi -Func tional Placer ST M1-S M ain ten an ce Ha nd bo ok 6 -7 Replace the Ring blower fuse Step 7 . Pull th e Fus e ca se to de tac h. Step 8 . Rep lace t he fu se wi t…

Yearly Inspection and Appendix
Chapter 6
Multi-Functional Placer
STM1-S Maintenance Handbook
6-6
Replace the Ring blower fuse
Yearly Inspection and Appendix
Step 4.
Shut off the power supply to the MCCB.
Step 5.
Shut off the power supply to the main power source
cable that is connected to MCCB.
Step 6.
Use a (+) screwdriver to remove the protection cover
from the power panel.

Yearly Inspection and Appendix
Chapter 6
Multi-Functional Placer
STM1-S Maintenance Handbook
6-7
Replace the Ring blower fuse
Step 7.
Pull the Fuse case to detach.
Step 8.
Replace the fuse with a new one.
Caution
When assembling the Fuse case, be careful to ensure the polarity
is correct.

Yearly Inspection and Appendix
Chapter 6
Multi-Functional Placer
STM1-S Maintenance Handbook
6-8
Ring blower inverter setup
Yearly Inspection and Appendix
Ring blower inverter setup
Measures
Step 1.
Refer to the following configuration table for Inverter,
and modify the configuration values of the Inverter.
Function Function name Setup range Initial Setup Modified value
A01 Frequency Command method (various
speed 0 speed command modification)
0-Main body volume
1-Input from control circuit terminal
2-Standard operator
3-Remote operator(1st communication-RJ45)
4-Remote operator(2nd communication-terminal block)"
1 0 X
(Time required: 15min / No. E-3)