STM1-S_SDV_Maintenance(Eng_Ver1).pdf - 第27页
Chap ter 2 Inspe ction It ems fo r Main t e nanc e Multi -Func tional Placer ST M1-S M ain ten an ce Ha nd bo ok 2- 6 Monthly Inspections (1/2) Inspection It ems for Maint enanc e

Chapter 2
Inspection Items for Maintenance
Multi-Functional Placer
STM1-S Maintenance Handbook
2-5
Monthly Inspections (1/2)
Check-up List
Replacement
Time
Reference
Time
required
Period No Inspection Item Measures Tools
Monthly
M-1 Head Spindle Clean Air gun, cloth 30 Minutes
M-2 Conveyor Sensor Inspect and clean Cotton swab, cloth 10 Minutes
M-3 Cover Cooling Fan Inspect and clean
Crosshead screwdriver,
vacuum cleaner
10 Minutes
M-4 Cover Cooling Fan Filter Replace Vacuum cleaner 6months 15 Minutes
M-5 Head LM Guide, Ball Spline Clean and apply grease Brush, cloth
Apply grease period:
3 months
30 Minutes
Setting the replacement period for parts
ㆍ Based on the regulated use environment.
ㆍ If the use environment is poor, the intervals for part inspection and replacement can be shortened.
ㆍ In the above table, C/S means our designated C/S company (STS) or our overseas local agents.
Monthly Inspections (1/2)

Chapter 2
Inspection Items for Maintenance
Multi-Functional Placer
STM1-S Maintenance Handbook
2-6
Monthly Inspections (1/2)
Inspection Items for Maintenance

Chapter 2
Inspection Items for Maintenance
Multi-Functional Placer
STM1-S Maintenance Handbook
2-7
Monthly Inspections (2/2)
Check-up List
Replacement
Time
Reference
Time
required
Period No Inspection Item Measures Tools
Monthly
M-6 X Frame LM Guide, Ball Screw
Clean and Lubrication
Lubricator, cloth AFE (THK) Lubrication period: 4 months 60 Minutes
M-7 Y Frame LM Guide
Clean and Lubrication
Lubricator, cloth AFE (THK) Lubrication period: 2 months 60 Minutes
M-8 Y Frame Ball Screw
Clean and Lubrication
Lubricator, cloth AFE (THK) Lubrication period: 2 months 20 Minutes
M-9 Ionizer Nozzle Cleaning
Air gun, cotton swab
Inspection period: 1 months 10 Minutes
M-10 Cover Cleaning
Utra-fine fiber cloth, Alcohol
(
Heavy Duty Staticide #2005,
#2001)
Inspection period: 1 months 15 Minutes
M-11 Y Cable Duct Cooling Fan Inspection and clean Vacuum cleaner
If it is found to have been damaged replace it. 15 Minutes
Yaer Y-1 Ionizer Nozzle
Inspection and
replace
Ionizer Nozzle Corresponding
fixture
If it is found to have been damaged replace it. 15 Minutes
ETC
E-1 Fuse Replace (+) driver
If it is found to have been damaged replace it. 15 Minutes
E-2 Ring blower fuse Replace (+) driver
If it is found to have been damaged replace it. 15 Minutes
E-3 Ring blower inverter Setup
15 Minutes
Setting the replacement period for parts
ㆍ Based on the regulated use environment.
ㆍ If the use environment is poor, the intervals for part inspection and replacement can be shortened.
ㆍ In the above table, C/S means our designated C/S company (STS) or our overseas local agents.
Monthly Inspections (2/2)