STM1-S_SDV_Maintenance(Eng_Ver1).pdf - 第41页
ST M1-S M ain ten an ce Ha nd bo ok 3-1 2 Chap ter 3 Daily Inspe ction Multi -Func tional Placer Inspection and clean unmanned transporter for obsolete tapes Daily Inspection T ool for M aintenanc e Ultra-fine fiber clot…

STM1-S Maintenance Handbook
3-11
Chapter 3
Daily Inspection
Multi-Functional Placer
Inspection the conveyor steel belt
Measures
Step 1.
Press the 'STOP' and 'RESET' buttons in order after
pressing the 'EMG' button on the OP panel to stop
operation.
For more details, refer to "How to perform emergency stop" on page
1-2.
Step 2.
Check the conveyor steel belt for any problems visually
or by pressing the belt
(look for peels, dents, bending, and ensure normal
vacuum creation)
Caution
When the conveyor steel belt has a problem, contact out C/S
company (STS) or local agent.
It is recommend to replace the Conveyor steel belt every 5 years.
Inspection the conveyor steel belt
(Time required: 5min / No. D-5)

STM1-S Maintenance Handbook
3-12
Chapter 3
Daily Inspection
Multi-Functional Placer
Inspection and clean unmanned transporter for obsolete tapes
Daily Inspection
Tool for Maintenance
Ultra-fine fiber cloth, alcohol
Measures
Step 1.
Press the 'STOP' and 'RESET' buttons in order after
pressing the 'EMG' button on the OP panel to stop
operation.
For more details, refer to "How to perform emergency stop" on page
1-2.
Step 2.
Checks the state of the Steel belt of the unmanned
transporter for obsolete tapes with the naked eye (look
for peels, tearing).
Caution
If there is any problem with Steel belt of unmaned transporter for
obsolete tapes, contact our C/S company (STS) or local sales
office.
Step 3.
When the Steel belt of an unmanned transporter for
obsolete tapes is contaminated, clean it using cloth
dampened with alcohol.
Inspection and clean unmanned transporter for
obsolete tapes
(Time required: 5min / No. D-6)

STM1-S Maintenance Handbook
3-13
Chapter 3
Daily Inspection
Multi-Functional Placer
Inspection and replace the Detach nozzle pad
Measures
Step 1.
Moves Detach to a location of Dump.
Step 2.
DETAPE PICK SOL in IO status dialog box is activated.
Inspection and replace the Detach nozzle pad
(Time required: 5min / No. D-7)