TT6094.ProductionHistory(YAMAHA_BRAND).pdf - 第13页
Y AMAHA Motor Co Ltd., IM Operation Mounter Soft Gr MDOC-SOFT5001 1 TT6094.Pr oductionHistory (Y AMAHA_BR AND).doc 13 / 53 6. Board Log (MIS) In Board Log tab, the production result is indicated as log in every on…

YAMAHA Motor Co Ltd.,
IM Operation
Mounter Soft Gr
MDOC-SOFT50011
TT6094.ProductionHistory(YAMAHA_BRAND).doc
12 / 53
5-2. File format
It indicates a version in the 1
st
row, “Grid with detail of each item” in the 2
nd
, and Error information in
order of occurrence below the 3
rd
row.
Fig. 5-2

YAMAHA Motor Co Ltd.,
IM Operation
Mounter Soft Gr
MDOC-SOFT50011
TT6094.ProductionHistory(YAMAHA_BRAND).doc
13 / 53
6. Board Log (MIS)
In Board Log tab, the production result is indicated as log in every one sheet of board produced with
the machine. A drive inside the machine save on the result of the board produced in the 1000 past. It
is recorded as the data on one line toward one sheet of board.
6-1. Grid with detail of each item (Edit: 4th)
Chart 6-1-1 Grid with detail of each item
<Item> <Example
>
<Contents>
(Xg / Yg Series)
<Contents>
(YS Series or later)
<Version>
Version V1.00 Version of the history recorded.
←
*1
Program
Name
TOPAZ_T
EST_1005
The program name chosen.
←
*1
Program
Comment
For_CUK9
3001
The comment of the program
chosen.
←
*1
Stage
A None Mounting Stage of which logs
are outputted.
*2
Start Time 2001/06/08
11:50:04
[The first board]
Production started time.
[The second or later]
Time when the previous board
arrives at the exit of the lowest
[The first board]
Time when the board is
detected at the entrance of a
mounting stage.
[Second or later]
*1

YAMAHA Motor Co Ltd.,
IM Operation
Mounter Soft Gr
MDOC-SOFT50011
TT6094.ProductionHistory(YAMAHA_BRAND).doc
14 / 53
stream.
Production Start Time is
recorded when a board starts
mounting before the previous
board arrives at the exit.
Time when the previous board
arrives at the exit of the lowest
stream.
Production Start Time is
recorded when a board starts
mounting before the previous
board arrives at the exit.
Finish Time 2001/06/08
11:50:47
Time when a board arrives at the
exit of the lowest stream.
Production started time or reset
time is recorded as Finish Time
when the next board starts
mounting before the previous
one arrives at the exit.
Time when the board arrives at
the exit of a mounting stage.
Production Start Time is
recorded as Finish Time when
the board starts mounting
before the previous board
arrives at the exit.
*1
Board
Count Max
10 The planned number of boards
mounted.
←
*1
Board Serial
No.
7 Serial Numbers of boards in
order of production in a program.
←
( Each stage gives serial
numbers to all boards mounted
on the stage)
*1
Finish Flag 0 0: Production finished
1: Uncompleted.
2: Restarted and completed
←
Production Finished Flag on a
mounting stage.
Sets the flag when it finishes
mounting.
Mount CT
(sec)
35.59 Time taken for mounting a
board.
Records a time between board
fixing and finishing mounting
except Mark Rec CT.
←
(YG300 starts recording from
when a board has been
transported on the mounting
point of U axis.)
Records about mounting tables
of a mounting stage.)
*1
Transfer CT
(sec)
4.76 Time spent on transferring a
board.
Time between board carrying
and fixing + Time between
←
*1