JO-109-002_JG-0209.pdf - 第111页

4-23 JO-109 1 106-002 2. Feeder Measurement (20) After all measurements are completed, the following dialog box opens. When it is not necessary to change the pickup height data, press the [Cancel] button. T o change the …

100%1 / 175
4-22
JO-109
1005-001
2. Feeder Measurement
(16) Press the [Space] key on the keyboard or the [X/Y Measurement]
button in the window to perform the measurement of the pickup
position.
When this operation is performed, the master tape is
automatically fed to the next pickup position after the
measurement is completed.
(17) After that, align the hole of the master tape with the center of the
crosshair again.
(18) Follow the same procedure as in (16) and perform the
measurement.
(19) The measurement is repeated the specied number of times.
Note
The defaults (measurement counts) are specied as follows.
Table D6
Models Measurement Counts
G*-*808*, GT-2404*, SL-4808* 10 times
G*-1216* or more 9 times
In the case of "8 mm Feeder", the following message box appears
after the measurement (repeated the above-described number of
times).
Subsequently, follow the same procedure to perform the
measurement for the lane #2 side.
Fig. D24
4-23
JO-109
1106-002
2. Feeder Measurement
(20) After all measurements are completed, the following dialog box
opens.
When it is not necessary to change the pickup height data, press
the [Cancel] button.
To change the pickup height data, enter the offset values and
press the [OK] button.
Reference
Refer to "3. Measurement of Jig Origin Height" in "Section 4"
for details.
As for the models "G*-12160" or higher, the pickup height
offsets are required only for Lane #1.
Fig. D25
(21) Subsequently, the following dialog box appears.
Press the [Yes] button to transmit the results of the measurement.
Otherwise, press the [No] button.
Results of Measurement
Data before Measurement
Fig. D26
4-24
JO-109
1106-002
2. Feeder Measurement
(22) Detach the master tapes rst, then the tape feeder from the jig.
Now, the measurement is completed.
Note
To measure another feeder (same model) subsequently, follow the
procedures starting with the master tape setting described in (5).
To measure another feeder (different model), follow the procedures
starting with the program change described in (3).
CAUTION
If you detach the tape feeder with the master tapes
being attached from the jig, you may cut your nger
with sharp edges of the master tapes or damage the
tapes by bending the master tapes, etc.
Be sure to detach the master tapes rst, then the
tape feeder from the jig.
Reference
Refer to "2.3 Attachment and Detachment of Master Tapes" in
"Section 4" for how to attach the master tapes.