JO-109-002_JG-0209.pdf - 第117页
4-29 JO-109 1005-001 2.1 Operation Procedure for [Measurement T ype 4] (7) When the sprocket reference positioning operation is completed, the following operation guide message is displayed. Then, attach the master tape …

4-28
JO-109
1005-001
2.1 Operation Procedure for [Measurement Type 4]
(6) When the conrmation guide message for the sprocket reference
positioning operation start, is displayed, click [OK].
Click [OK].
Fig. D32
After the communication with the feeder is started and the
parameter reading is performed, the feeder sprocket turns round
and the reference positioning operation is started up.
This operation is performed in the Lane 1 and Lane 2 in this
order.
Note
With the above procedure, the jig origin adjustment is ready.

4-29
JO-109
1005-001
2.1 Operation Procedure for [Measurement Type 4]
(7) When the sprocket reference positioning operation is completed,
the following operation guide message is displayed.
Then, attach the master tape and light shading jig correctly.
Reference
Refer to "2.3 Attachment and Detachment of Master Tapes" in
Section 4, for the attachment of the master tape.
Set the master tape and light shading
jig and click the [OK] button.
When the attachment is completed, click the [OK] button.
After that, the same adjustment operation procedure as for [Measurement Type 3] is performed.
Recognition mark position teaching, L1, L2 pick-up holes (every 45 perforations) teaching
Fig. D33

4-30
JO-109
1005-001
2.1 Operation Procedure for [Measurement Type 4]
(8) Perform the recognition mark position teaching.
Fig. D34
(9) Perform the Lane 1 pick-up hole position teaching.
Notice
Teach all 45 hole positions as many as for one turn of the
sprocket. Do not omit any of them.
The measurement times are increased. However, it is the
operation required for the sprocket offset adjustment.
Fig. D35