20121120111955_KY8030_2_Maintenance_Manual_Eng_ver1.pdf - 第30页
30 | KY -8030 2 3D Solder Paste Inspec tion System V ersion 1.0 K OH Y OUNG T ECHNOLOGY I NC . screwdriver . 5. Assemble the Roller with screwdriver and combine Ring Belt. 6. Assemble the …

Maintenance Manual | 29
1.2.5. CONVEYOR RING BELT AND ROLLER
Figure 1-6. Timing Belt and Roller
Item Description Item Description
1 Belt Guide 3 Ring Belt
2 Roller 4 Tensioner
1. Cutthepower/theairsupplyandpressemergencyswitch.
2. OpentheFrontDoor/WindowanddisassembleRearCover/RightSideCover.
3. DisassembletheBeltGuideasthediagram.
4. Disassemble the changing Ring Belt from Roller and disassemble the Roller with
② ① ④ ③

30 | KY-8030 2
3DSolderPasteInspectionSystem
Version 1.0
KOH YOUNG TECHNOLOGY INC.
screwdriver.
5. AssembletheRollerwithscrewdriverandcombineRingBelt.
6. AssembletheBeltGuide.
7. ChecktheBeltTensionandsettotheappropriateTensionwithTensionerifitisloosen.
8. SupplypowerandchecktheRingBeltrotationstatebyturningontheRingBeltTransfer
Motor
attheI/Oscreen.
ÚNote
If Ring Belt is damaged and there isno spare Ring Belt, the damagedRing Belt can be temporarily
connectedbyheatingbothends.
AsRingBeltisanelasticbody,theTensionshouldbeadjustedbyusingTensionerinevery3month.

Maintenance Manual | 31
1.2.6. CONVEYOR PCB CHECK SENSOR
Figure 1-7. PCB Check Sensor
Item Description Item Description
1 PCB Check Sensor 3 Position Sensor Bracket
2 Sensor Bracket 4 In/Out Sensor Bracket
1. Cutthepower/theairsupplyandpressemergencyswitch.
2. OpentheFrontDoor/WindowanddisassembleRearCover/RightSideCover.
3. DisassembleConnectorofPCBCheckSensor.
② ① ④ ③
Checking
Position