Maintenance Manual | 61 3. S YSTEM I NSTALLATION 3.1. System Installation Flow Chart System, PC, Monitor Unpacking Open the front door/back cover and connect the p ower cable with the P C Install the system in the Line a…

100%1 / 102
60 | KY-8030 2
3DSolderPasteInspectionSystem
Version 1.0
KOH YOUNG TECHNOLOGY INC.
2.5. Spare Parts of KY-8030 2
2.5.1. STANDARD PART
1) SMEMA cable for previous system 1 ea.
2) SMEMA cable for next system 1 ea.
3) Power cable 1 ea.
4) User Manual 1 ea.
5) System recovery CD 1 ea.
6) Windows XP CD 1 ea.
7) PC Manual 1 ea.
2.5.2. SPARE PART
1) KY-8030 2 Conveyor Belt (Ring belt for work conveyor: Ø3, Length 2130 mm) 1 ea.
2) Roller
3D R Flange Roller(602415-000009) 1 ea.
D Flange Belt Roller(602415-000012) 1 ea.
3) Fan filter (120 x 120 mm) 2 ea.
2.5.3. OPTION
1) Calibration Target 1 ea.
2) Offline Programming Station (Dongle Key included) 1 ea
3) In-line barcode reader, platform and cable 1 ea
4) Camera barcode reader dongle key 1 ea
5) Handheld barcode reader 1 ea
Maintenance Manual | 61
3. SYSTEM INSTALLATION
3.1. System Installation Flow Chart
System, PC, Monitor Unpacking
Open the front door/back cover
and connect the power cable
with the PC
Install the system in the Line and
connect SMEMA
X-Y Gantry and I/O TEST at the
GUI using manual
Power/Air supply
System Align and leveling
(refer to the diagram)
Disassemble the X-Y Gantry fix
Bracket
(refer to the diagram)
Operate the system if no
abnormality occurs
PCB import/export
conveying failure
PCB conveying
failure
Vibration when
operating the
system
Refer to the power
connection part for the
connection of 3phase
voltage
Label check
when connecting
the cable
62 | KY-8030 2
3DSolderPasteInspectionSystem
Version 1.0
KOH YOUNG TECHNOLOGY INC.
Figure 3-1. Cross Level Gauge and Foot Locations
Levelthesystembyadjustingthe4feetwithwrench.
Cross Level Gauge
Foot