OM-1241-005_w.pdf - 第139页

4-12 AIX-ML T-ID 3.3 Inspection, Cleaning, and Lubrication Spots 0705-003 Linear Guide Every 3 Months Lubrication (DAPHNE EPONEX GREASE No. 1) Required T ime: 5 minutes W ipe off old grease with an oiled rag and apply ne…

100%1 / 211
4-11
AIX-MLT-ID
0705-003
3.3.2 Elevator Shaft
Before the maintenance work, manually move the elevator to the position for
easier lubrication work and turn off the power.
The maintenance cover must be detached to apply grease to the elevator
shaft.
Reference
Refer to "4.1 Detachment and Attachment of Maintenance Cover" for how
to detach the cover.
Ball Screw
Every 3 Months Lubrication
(DAPHNE EPONEX GREASE No. 1)
Required Time: 10 minutes
Wipe off old grease with an oiled rag and
apply new one with a brush.
Take ample care not to leave any
waste threads after cleaning.
Notice
Fig. D5
3.3 Inspection, Cleaning, and Lubrication Spots
4-12
AIX-MLT-ID
3.3 Inspection, Cleaning, and Lubrication Spots
0705-003
Linear Guide
Every 3 Months Lubrication
(DAPHNE EPONEX GREASE No. 1)
Required Time: 5 minutes
Wipe off old grease with an oiled rag and
apply new one with a brush or supply
grease from eight grease nipples with a
grease gun.
Take ample care not to leave any
waste threads after cleaning.
Notice
Belt
Every 3 Months Inspection
Required Time: 1 minute
Visually inspect the wear of the belt.
Fig. D6
4-13
AIX-MLT-ID
3.3 Inspection, Cleaning, and Lubrication Spots
0705-003
3.3.3 Traverse
Bolt
Linear Guide
Every 3 Months Lubrication
(DAPHNE EPONEX GREASE No. 1)
Required Time: 5 minutes
Wipe off old grease with an oiled rag and apply new one
to the grooves of the linear guide with a syringe.
Take ample care not to leave any waste threads
after cleaning.
Pallet Receiver
Every 3 Months Inspection
Required Time: 1 minute
Visually inspect the wear of the pallet
receiver.
When the receiver is worn out to the extent
that the pallet is warped, follow the steps
below for the replacement.
1. Remove five bolts (one on side)
fastening the pallet receiver and detach
the receiver.
2. Attach a new pallet receiver and tighten
the bolts.
Note
No. 18
Use No. 18 (green) nozzle.
Notice
Fig. D7