00193897-0302_AI_MTC2+BE_DE+EN.pdf - 第95页

Assembly instructions MTC2 and Component docking unit on SIPLACE HF and X-series Edition 07/2009 93 2 Fig. 2.6.7 HF until A001_loc.2/4 with docking unit inside right

100%1 / 146
Assembly instructions MTC2 and Component docking unit on SIPLACE HF and X-series
Edition 07/2009
92
2.6.3 Final work after installation of the component docking unit:
: Route the cables and hoses in the cable duct.
: Stow connectors, couplings and further cable materia
l in the opening in the machine frame.
: If provided, mount the conveyor cover, nozzle chan
ger and reject bin sensors. For further in-
formation, see the latest inst
ructions:
00193892-xx Assembly instructions conveyor cover SIPLACE HF-series / X-series / D3
00193756-xx Assembly instructions nozzle changer SIPLACE HF-series
00194550-xx Assembly instructions reject bin sensors SIPLACE HF-series
2
: Mount the waste chute.
: Fit the cover over the pneumatic unit or power supply.
X110 ODU connector
on docking unit frame
2
Fig. 2.6.6 HF until A001_loc.2/4 with docking unit outside left
Assembly instructions MTC2 and Component docking unit on SIPLACE HF and X-series
Edition 07/2009
93
2
Fig. 2.6.7 HF until A001_loc.2/4 with docking unit inside right
Assembly instructions MTC2 and Component docking unit on SIPLACE HF and X-series
Edition 07/2009
94
2.7 Installation of component docking unit for S-tape
feeders on a SIPLACE HF (Series No. from A001),
X-series and D3
2
Crash risk:
This component docking unit in combination with a C&P2
0 head is not permitted!
2
The machine has to look like this: 2
2
Fig. 2.7.1 For installation in prepared machine