VDA_6.3_EN_Yellow_Volume_22-05-16.pdf - 第64页

62 P4.3 Are the material/immaterial resources avai lable and are they suitable to ensure product and process implementation? Minimum requirements relevant for assess- ment Examples for implementation A process to determi…

100%1 / 107
61
P4.2 Are personnel resources available and are the personnel qualified to
ensure product and process implementation?
Minimum requirements relevant for assessment
Examples for implementation
A staff schedule must be available.
The employees’ tasks, responsibilities and authori-
zations are defined and allocated. This also applies
to the staff of external service providers. Appropri-
ate evidence must be available.
It must be ensured that needs assessments is car-
ried out regularly during product and process devel-
opment with regard to potentially emerging bottle-
necks and additional requirements.
Qualified personnel are available during all phases
of product and process implementation, and the re-
quirements regarding the series production person-
nel have been derived.
Processes that have been outsourced must be
taken into account.
Product/process development
Customer requirements
Requirements profile for the
relevant jobs
Determination of the need for
training
Evidence of training
Knowledge of methods
Knowledge of foreign lan-
guages
Software development: Qual-
ified software testers, inte-
gration managers, etc.
Agile development due to
qualified roles (DevOps Man-
ager, Release Train Man-
ager, etc.)
Copyright by VDA QMC
62
P4.3 Are the material/immaterial resources available and are they suitable to
ensure product and process implementation?
Minimum requirements relevant for assess-
ment
Examples for implementation
A process to determine resources has been imple-
mented.
The provision of resources refers to the availability
of buildings, measuring and inspection equipment,
laboratory equipment, machinery, plants, IT sys-
tems and infrastructure as well as their utilization.
Processes that have been outsourced must be
taken into account.
Regular needs assessment must be carried out
during product and process development with re-
gard to potentially emerging bottlenecks and addi-
tional requirements.
Material/immaterial resources are available for all
phases of product and process implementation,
and the requirements for series production have
been derived.
Equipment for in-house transport, such as packag-
ing and special load carriers, has been defined
and is available in sufficient quantities.
Product/process development
Customer requirements
Technical interface to the cus-
tomer and suppliers
ERP systems
Supporting processes, e.g.
from logistics and IT
Product development
Resources for verification and
validation
Test setups, e.g. Hardware in
the Loop (HIL), test boards,
evaluation boards
Development tools, provision
of the tool chain for software
development
Process development
Facility planning
Facility layout
Release of plants and ma-
chines, line clearance
Quantities and throughput
times
Transport routes
Transport, containers, storage
Capacity before the start of
series production (initial stock)
Copyright by VDA QMC
63
P4.4* Are the required proofs of capability and releases for product and pro-
cess development available?
Minimum requirements relevant for assessment
Examples for implementation
The releases and proofs of capability are available
for all items, assemblies, software versions and
purchased products/services in accordance with
development schedules.
The capability of the measuring and inspection
equipment has been proven.
The material data has been confirmed and re-
leased.
The measures from the risk analyses (e.g. FMEA,
HARA) have been included in the product and pro-
cess implementation, and their effectiveness has
been confirmed.
In case of products with integrated (embedded)
software, the software-related aspects according to
VDA Volume 2 have to be taken into account.
The production process and product approval
(PPA) must be available on the agreed date. The
tolerances of process parameters for the production
of special characteristics have to be verified.
Product/process development
PPA results, in particular
confirmation of conformity
with statutory and regulatory
requirements
PPA results for purchased
products and services
Development releases from
customers
Process development
Process parameters and
their tolerances
Confirmed logistics concept
(e.g. suitability of packaging
through sample shipping)
Proofs of capability
Capacity studies
Plant and tool releases
Software
Recommendations for use
(release notes) for each re-
lease
Release of third-party soft-
ware and FOSS in accord-
ance with customer require-
ments
Provision of test results and
test evaluations
Copyright by VDA QMC