64 P4.5 Have the planned procurement activities been implemented? Minimum requirements relevant for assessment Examples for implementation The planned procurement activities have been im- plemented. This includes risk as…

63
P4.4* Are the required proofs of capability and releases for product and pro-
cess development available?
Minimum requirements relevant for assessment
Examples for implementation
The releases and proofs of capability are available
for all items, assemblies, software versions and
purchased products/services in accordance with
development schedules.
The capability of the measuring and inspection
equipment has been proven.
The material data has been confirmed and re-
leased.
The measures from the risk analyses (e.g. FMEA,
HARA) have been included in the product and pro-
cess implementation, and their effectiveness has
been confirmed.
In case of products with integrated (embedded)
software, the software-related aspects according to
VDA Volume 2 have to be taken into account.
The production process and product approval
(PPA) must be available on the agreed date. The
tolerances of process parameters for the production
of special characteristics have to be verified.
Product/process development
• PPA results, in particular
confirmation of conformity
with statutory and regulatory
requirements
• PPA results for purchased
products and services
• Development releases from
customers
Process development
• Process parameters and
their tolerances
• Confirmed logistics concept
(e.g. suitability of packaging
through sample shipping)
• Proofs of capability
• Capacity studies
• Plant and tool releases
Software
• Recommendations for use
(release notes) for each re-
lease
• Release of third-party soft-
ware and FOSS in accord-
ance with customer require-
ments
• Provision of test results and
test evaluations
Copyright by VDA QMC

64
P4.5 Have the planned procurement activities been implemented?
Minimum requirements relevant for assessment
Examples for implementation
The planned procurement activities have been im-
plemented. This includes risk assessments, the
project plan, the maturity level, releases and ob-
serving deadlines.
The planning activities according to the risk classifi-
cation have been implemented; measures have
been derived and their implementation is moni-
tored.
The required proofs of capability and releases (pro-
cess and product release) for the purchased prod-
ucts and services are available in accordance with
the project schedule. The material data has been
confirmed and released.
The relevant project-specific customer require-
ments have been taken into account.
The processes for ensuring customer care/cus-
tomer satisfaction/customer service as well as field
failure analysis have been established.
• PPA release
• FMEA, HARA
• VDA 6.3 audit, potential ana-
lysis etc.
• Releases, evidence and per-
formance tests in accord-
ance with the coordinated
PPA procedure
• NTF process, triggering crite-
ria for stress tests have been
defined
• Spare parts supply concepts
• Contingency plans
• Interface agreement (ser-
vices according to DIA or in-
terface agreement)
• Sub-supplier management
by auditee for off-the-shelf
components, engineering as-
signments (no personnel
leasing)
• Reference to the ASPICE
Acquisition Process Group,
ACQ2, ACQ.3, ACQ.4
Copyright by VDA QMC

65
P4.6 Are the manufacturing and inspection specifications derived from prod-
uct and process development and are they implemented?
Minimum requirements relevant for assessment
Examples for implementation
The manufacturing and inspection specifications
contain all inspection characteristics from product
and process development (including special char-
acteristics). These must take into account all the
components, assemblies, sub-assemblies, and ma-
terials, including the processes for manufacturing
the products.
The results of the risk analysis are considered (e.g.
FMEA, HARA).
A production control plan is available.
It must be available throughout the prototype phase
(if required by the customer), the pre-launch phase
and the series production phase.
The scope and the elements of product audits and
requalification tests have been defined.
Maintenance specifications are available.
All test cases are described in accordance with the
test levels and the customer requirements (e.g. V-
Model).
The software functions required at the respective
times are released.
Product/process development
• Risk analyses
Product development
• Product audit plan
• Requalification planning
Process development
• Inspection instruction
• Work instruction
• Reaction plans
• Production release (first and
last piece, repeat release)
• In-line inspections
Software
• Requirements for ensuring
correct installation of the
software
• Release criteria in the pro-
duction test