User-Manual-NeoDen3V-PNP-machine.pdf - 第7页

2 1.2. Structure o f NeoDen 3V ⑦ ⑧ ① ② ③ ④ ⑤ ⑫ ⑥ ⑨ ⑪ ⑩ ⑬ Each part mention ed ab ove c an be disasse mbled and maintaine d. Please find more details on Chapter 3. ① :Start/Pa use Butto n ② :On/off Button ③ :Emergency But…

100%1 / 42
1
1. NeoDen 3V Introduction
1.1. Brief Introduction
Compared with the previous version TM245P, NeoDen 3V adopts a high-definition camera that could
mount most kinds of components including micro chips like 0402, fine-pitch ICs like QFN and so on; and with
high speed and accuracy, small volume, low power, stable performance and easy operation, NeoDen 3V
committed to create the greatest value and try to fulfill all demands for customers in the actual production.
2
0.02mm
0~360°
5000CPH (vision off); 3500CPH (vision on)
320*390(X、Y)(feed from the left side and back side)
yes
CN040/CN065/CN100/CN140/CN220/CN400/CN750
0402-5050,SOP, TQFP and so on
10
5 ( customization supported)
8mm、12mm、16mm、24mm
46( all 8mm in width)
0.02mm
160~200W
AC 220V/110V
820(I)*680(W)*410(H)mm
60KG
2
1.2. Structure of NeoDen 3V
⑦
⑧
①
②
③
④
⑤
⑫
⑥
⑨
⑪
⑩
⑬
Each part mentioned above can be disassembled and maintained. Please find more details on Chapter 3.
①:Start/Pause Button
②:On/off Button
③:Emergency Button
④:USB Connector
⑤:Fixation Holder
⑥:Head
⑦:Needle
⑧:Nozzle
⑨:Backward Fixed Block
⑩:Feed Chute
⑪:Peel Box
⑫:Vibration Feeder
⑬:Reel Holder
3
1.3. Operation Flow Chart
NO.
Flow Chart
Remark
1
Checking the working area whether it is safe or not
2
3
Machine will start a 1-2 mins self-inspection process after
boot-up. The head will travel along in X&Y axis. It will
enter the operation page once finished.
4
5
Plz refer to the detailed programming tutorial in Page5
6
After making a programming file, there may exist several
programming issue, such as rotation issues of
components, thus a production testing is necessary for
solving issues.
7
Start to pick and place.
8
Production finish, exit.
9
Shut down the system via computer, then power off the
machine.
10
Disconnect the electricity supply after the system being
powered off.
11
Keep the machine clean, daily maintenance of the nozzles
to assures its high utility.
System power off
Power off
Cleaning and
maintenance
Exit
Mounting
Preparation
Turn on
Initialization
Operation page
Edit
Yes
Test
Modify
No