00195094-0202-MM-D3_EN.pdf - 第46页

9 4-monthly maintenance jobs SIPLACE D3 08/2008 US Edition 46 9 4-monthly maintenance jobs 9.1 Maint ain the C&P 6 / 12 placement heads Structur e of the 12-segment Collect&Place head 9 s a g f d 9 Fig. 9.1 - 1 1…

100%1 / 98
SIPLACE D3 8 2-monthly maintenance jobs
08/2008 US Edition
45
Vacuum the felt filter drawer units 8
a Remove the covers from the felt filter the drawer units.
s Use an appropriate nozzle to vacuum the felt filters.
: Check the filter
mats for dirt after cleaning them with a vacuum cleaner.
Replace them if they are very dirty.
: Replace any worn felt filters.
: Fit the covers.
: Repeat these tasks for all eight fans.
8
8
Check the filter element 40 µm 8
: Remove the protective cover from the relevant placement head.
d Loosen the screw in order to remove the casing of the filter element 40 µm.
f Check whether
the filter element is discolored.
If it is discolored, replace it with a new element.
: Fit the casing and the head cover.
: Check the filter
elements of all the placement heads.
8
8
: Close the protective covers.
8
9 4-monthly maintenance jobs SIPLACE D3
08/2008 US Edition
46
9 4-monthly maintenance jobs
9.1 Maintain the C&P 6 / 12 placement heads
Structure of the 12-segment Collect&Place head 9
s
a
g
f
d
9
Fig. 9.1 - 1 12-segment Collect&Place head, digital
(1) Vacuum generator
(2) Turning station, DP axis
(3) Star with 12 sleeves, DR axis
(4) Forced air valve
(5) Silencer
SIPLACE D3 9 4-monthly maintenance jobs
08/2008 US Edition
47
9
For the 4-monthly maintenance of the C&P heads 6 / 12 you will need: 9
Pliers for fitting the K hose 2MS-PK-3/4
Short-bristled brush
Set of hexagon socket spanners
Lint-free cloths
Lint-free cottonwool buds
Ethyl alcohol
ISOFLEX TOPAS NCA52
UNISILKON L250L
Oil dispenser with Structovis GHD (replaces MULTEMP PS No. 2 grease gun)
Set of cleaned sleeves (new set, if required)
Set of cleaned valve plungers (new set, if required)
New Z axis toothed belt, if required
New distributor, if required
New O-ring for the turning station, if required
New toothed belt for the turning station, if required.
9
9
Preparatory work 9
: Return the nozzles of all Collect&Place heads to the nozzle changer.
: Switch the
p
lacement machine off at the main switch.
9
: Remove the head cover.
9
9
9