00195094-0202-MM-D3_EN.pdf - 第48页

9 4-monthly maintenance jobs SIPLACE D3 08/2008 US Edition 48

100%1 / 98
SIPLACE D3 9 4-monthly maintenance jobs
08/2008 US Edition
47
9
For the 4-monthly maintenance of the C&P heads 6 / 12 you will need: 9
Pliers for fitting the K hose 2MS-PK-3/4
Short-bristled brush
Set of hexagon socket spanners
Lint-free cloths
Lint-free cottonwool buds
Ethyl alcohol
ISOFLEX TOPAS NCA52
UNISILKON L250L
Oil dispenser with Structovis GHD (replaces MULTEMP PS No. 2 grease gun)
Set of cleaned sleeves (new set, if required)
Set of cleaned valve plungers (new set, if required)
New Z axis toothed belt, if required
New distributor, if required
New O-ring for the turning station, if required
New toothed belt for the turning station, if required.
9
9
Preparatory work 9
: Return the nozzles of all Collect&Place heads to the nozzle changer.
: Switch the
p
lacement machine off at the main switch.
9
: Remove the head cover.
9
9
9
9 4-monthly maintenance jobs SIPLACE D3
08/2008 US Edition
48
SIPLACE D3 9 4-monthly maintenance jobs
08/2008 US Edition
49
Remember to follow the ESD regulations.
9
9
9
: Cover the feeder area to protect the feeder modules and front part of the head.
9
a Open the strain relief.
s Open the retainer over the ribbon cables.
d Pull out the two ribbon cables.
9
f Loosen the 4 screws on the front part of head (using the 3 mm socket-head spanner) and re-
move the front part.
Hold the front part of head firmly as you remove the screws. 9
Be careful not to touch the distributor. 9
9
Turn the star half a revolution to avoid damaging the valve plunger drive with the valve plunger.9
9
: Place the front part of head on a soft ESD surface (with the valve plunger side underneath) or
place it on a suitable head stand.
: Remove the sleeves and place them in the containers provided.
9