00195094-0202-MM-D3_EN.pdf - 第63页
SIPLACE D3 9 4-monthly maintenance jobs 08/2008 US Edition 63 a Carefully clean the V enturi nozzles using a lint- free cloth moistened with ethyl alcohol. a Blow through the V enturi nozzles with compressed air . a Clea…

9 4-monthly maintenance jobs SIPLACE D3
08/2008 US Edition
62
SIPLACE D3 9 4-monthly maintenance jobs
08/2008 US Edition
63
a Carefully clean the Venturi nozzles using a lint-free cloth moistened with ethyl alcohol.
a Blow through the Venturi nozzles with compressed air.
a Clean the O-rings with a dry lint-free cloth (replace them, if required).
a Lightly grease the O-rings of the Venturi nozzles with UNISILKON L250L.
a Clean the vacuum generator block with a cottonwool bud moistened with ethyl alcohol and
blo
w through with compressed air.
a Place the cleaned
parts of the vacuum generator on a clean surface.
Silencer 9
: Lo
osen the screw on the silencer and remove the silencer.
s Clean the holes to the Venturi nozzles with a cottonwool bud moistened with ethyl alcohol.
: Check the sile
ncer for dirt.
If there are any signs of discoloration, replace the silencer and reverse the sequence described
above to fit.
Ass
emble the vacuum generator 9
: Asse
mble the block with the Venturi nozzles and carefully screw tight.
d Use the pliers to reattach th
e compressed air hoses.
: Fit the head cover.
: Reattach the nozzles.
9
Test placement 9
The distance between the component camera and the PCB camer
a can be changed by separating
the front and back parts of the head. 9
: Carry out a test placement run to test whether the placement
accuracy is still guaranteed.
: If the placement accuracy is not guaranteed, remeasure the segment offset 2.
9
Conveyor width adjustment 9
: If the PCB wid
th adjustment has not been moved over the last four months, we recommend
that you move the conveyor to the minimum and maximum widths, If you do not do this, you
may experience problems when you move the conveyor rails.

10 Annual maintenance work SIPLACE D3
08/2008 US Edition
64
10 Annual maintenance work
10