00195094-0202-MM-D3_EN.pdf - 第65页
SIPLACE D3 10 Annual maintenance work 08/2008 US Edition 65 10 Y ou will need for the an nual maintenance jobs: 10 – Phillips screwdriver – Set of hexagon socket spanners – Lint-free cloths – Ethyl alcohol – SIPLACE cle …

10 Annual maintenance work SIPLACE D3
08/2008 US Edition
64
10 Annual maintenance work
10

SIPLACE D3 10 Annual maintenance work
08/2008 US Edition
65
10
You will need for the annual maintenance jobs: 10
– Phillips screwdriver
– Set of hexagon socket spanners
– Lint-free cloths
– Ethyl alcohol
– SIPLACE cleaning tissue
– ISOFLEX TOPAS NCA52 grease
– Grease gun
– SIPLACE cleaning tissue
– Klüberplex BEM 34-132
– Grease nipple
– Cooling air hoses
– Gas spring(s) in protective cover, if required.
10
There must be no PCBs on the PCB conveyor for the following jobs. 10
: Open both protective covers on one side of the machin
e (locations 1+2 and 3+4).
10
Push the gantry carefully and gently using the handle on the head (not on the end buffers). 10
10
: Move the gantry over the feeder modules. This will stop it outside your working area.
10
Clean and preserve the PCB conveyor 10
a Clean and preserve the recirculating ball screw by
running a SIPLACE cleaning tissue along
the thread of the screw.
s Clean and grease the sliding surfaces of the guide
rails using a SIPLACE cleaning tissue.
: Clean and preserve the hexagonal shafts using a SIPLACE cleaning tissue.
: Check that
the
entire PCB conveyor mechanism (conveyor, width adjustment, clamping unit)
moves easily.
Carry out the necessary maintenance if it does not move easily.
10
Clean the fixing strip (PCB conveyor) 10
d Clean the fixing strip of the width adjustment clam
ping unit using a lint-free cloth moistened
with ethyl alcohol.

10 Annual maintenance work SIPLACE D3
08/2008 US Edition
66
10