00195094-0202-MM-D3_EN.pdf - 第47页

SIPLACE D3 9 4-monthly maintenance jobs 08/2008 US Edition 47 9 For the 4-monthly maintenance of the C&P hea ds 6 / 12 you will need: 9 – Pliers for fitting the K hose 2MS-PK-3/4 – Short-bristled brush – Set of hexag…

100%1 / 98
9 4-monthly maintenance jobs SIPLACE D3
08/2008 US Edition
46
9 4-monthly maintenance jobs
9.1 Maintain the C&P 6 / 12 placement heads
Structure of the 12-segment Collect&Place head 9
s
a
g
f
d
9
Fig. 9.1 - 1 12-segment Collect&Place head, digital
(1) Vacuum generator
(2) Turning station, DP axis
(3) Star with 12 sleeves, DR axis
(4) Forced air valve
(5) Silencer
SIPLACE D3 9 4-monthly maintenance jobs
08/2008 US Edition
47
9
For the 4-monthly maintenance of the C&P heads 6 / 12 you will need: 9
Pliers for fitting the K hose 2MS-PK-3/4
Short-bristled brush
Set of hexagon socket spanners
Lint-free cloths
Lint-free cottonwool buds
Ethyl alcohol
ISOFLEX TOPAS NCA52
UNISILKON L250L
Oil dispenser with Structovis GHD (replaces MULTEMP PS No. 2 grease gun)
Set of cleaned sleeves (new set, if required)
Set of cleaned valve plungers (new set, if required)
New Z axis toothed belt, if required
New distributor, if required
New O-ring for the turning station, if required
New toothed belt for the turning station, if required.
9
9
Preparatory work 9
: Return the nozzles of all Collect&Place heads to the nozzle changer.
: Switch the
p
lacement machine off at the main switch.
9
: Remove the head cover.
9
9
9
9 4-monthly maintenance jobs SIPLACE D3
08/2008 US Edition
48