xp141-241-341-5.0E.pdf - 第54页

FK-9F98- 29 XP Series Training Text for Service Engineers Edition 5.0 XP141 – Chapter 5 Peripheral Adjustments Page 16 of 16 Fuji Machine Mfg. Co., Ltd. Okazaki SMT Equipment Quality Assurance Dept. 5 – 16 CS Section Air…

100%1 / 234
FK-9F98-29 XP Series Training Text for Service Engineers
Edition 5.0 XP141 – Chapter 5 Peripheral Adjustments Page 15 of 16
Fuji Machine Mfg. Co., Ltd. Okazaki
SMT Equipment Quality Assurance Dept.
5 – 15 CS Section
5.5 Waste tape duct height adjustment
1. Clamp the MFU and insert feeders in slots number 2 and 49.
2. Set the height of the waste tape duct approximately 1mm higher than the top of the
feeder so that there is sufficient clearance for the waste tape to feed down the duct into
the waste tape box.
3. Set the waste tape duct 1.5 to 3.5mm from the tape feeder end in the Y-direction. Please
refer to the diagram above.
5.6 Measuring the vacuum pressure
1. Equipment: manometer. Nozzle and air tube.
Vacuum pressure check
1. Select [Maintenance A] – [I/O Check] – [Y01F ResetCylinder] – [ON] to raise the parts
vacuum pin and the air blow pin.
2. Select [Maintenance A] – [I/O check] – [Y01F ResetCylinder] – [OFF] to lower the reset
cylinder.
3. Attach the nozzle and air tube at nozzle
position 1.
4. Press the nozzle No.1 vacuum pin down.
5. Select [Maintenance A] – [I/O Check] – [Y016
VacuumPump] – [ON] and check the vacuum
pressure reading on the manometer.
6. The reading should be –600 mmHg (-79.99
kPa) or more negative.
1.5 to 3.5mm
Approx. 1mm
Vacuum pin
Air blow pin
FK-9F98-29 XP Series Training Text for Service Engineers
Edition 5.0 XP141 – Chapter 5 Peripheral Adjustments Page 16 of 16
Fuji Machine Mfg. Co., Ltd. Okazaki
SMT Equipment Quality Assurance Dept.
5 – 16 CS Section
Air blow pressure check
1. Select [Maintenance A] – [I/O Check] – [Y01F ResetCylinder] – [ON] to raise the parts
vacuum pin and the air blow pin.
2. Select [Maintenance A] – [I/O check] – [Y01F ResetCylinder] – [OFF] to lower the reset
cylinder.
3. Attach the nozzle and air tube at nozzle position 1.
4. Push down the vacuum pin and the air blow pin.
5. Select [Maintenance A] – [I/O check] – [Y016 VacuumPump] – [ON] and [Y01D
partspickUpDes] – [ON] and check the air blow pressure. Adjust the air regulator on top
of the placement head until the pressure reading is 110 +/- 10 mmHg (14.67 +/- 1.33
kPa).
To adjust pull
down and
turn.
C
C
h
h
a
a
p
p
t
t
e
e
r
r
6
6
P
P
r
r
o
o
p
p
e
e
r
r
D
D
a
a
t
t
a
a
M
M
e
e
a
a
s
s
u
u
r
r
e
e
m
m
e
e
n
n
t
t
s
s