OPERATING MANAUAL(FOR ENGINEERS).pdf - 第129页

Page 6-3 FILE OPERA TION 6 File Operation of PT100 6-1-1 Loading Data Production data in PT100 is loaded to the memory of machine. ∗ Data memorized in the machine is deleted. Load data after saving. 1 . Press Load . • Lo…

100%1 / 168
Page 6-2
3Y3C-E-EMD06-A01-00
6-1 File Operation of PT100
Data created in PT100 is loaded and saved.
1. Press
File
managment
.
File operation screen appears.
2. Press PT100 .
Object device is changed to PT100.
Page 6-3
FILE OPERATION
6
File Operation of PT100
6-1-1 Loading Data
Production data in PT100 is loaded to the memory of machine.
Data memorized in the machine is deleted. Load data after saving.
1. Press Load .
Load is highlighted.
2. Select a data name to load.
Selected data name is highlighted.
3. Press Yes .
Data is loaded.
To stop loading data, press No .
To the next page
2
1
3Y3C-E-EMD06-A01-00
Page 6-4
File Operation of PT100
The message “Loading data...” appears.
After loading, the screen on the left appears.
3Y3C-E-EMD06-A01-00