EUS0153210_YFact_Standard_E.pdf - 第174页

Chapter 4 Feeder Viewer Contents 1. About the Feeder Viewer 4- 1 1.1 Starting the Feeder Viewer 4- 1 1.2 Quitting the Feeder Viewer 4- 3 2. Basic operation 4- 4 2.1 Plan information screen 4- 4 2.2 Creating new plan info…

100%1 / 238
3-53
3
Board Editor
4.4 Edit single combined program
On single combined program, mount information of each lane is same because each lane mounts on same
board. So mount information of all lane are changed if its of one lane is changed.
Edit single combined program
“Befor”
“After” If Mount information of lane 1 is changed, its of lane 2 is also changed.
64383-S0-00
Chapter 4 Feeder Viewer
Contents
1. About the Feeder Viewer 4-1
1.1 Starting the Feeder Viewer 4-1
1.2 Quitting the Feeder Viewer 4-3
2. Basic operation 4-4
2.1 Plan information screen 4-4
2.2 Creating new plan information 4-18
2.3 Opening a plan file 4-21
3.
Editing the data on the plan information screen
4-22
3.1 Switching the production lines 4-22
3.2 Adding or deleting board data 4-23
3.2.1 Adding board data 4-23
3.2.2 Deleting board data 4-24
3.3 Changing the order of board data 4-25
3.4 Editing the board data 4-27
3.5 Saving the board data 4-28
3.6 Changing the feeder or tray position 4-30
3.6.1 Moving a feeder within the same machine 4-30
3.6.2 Moving a feeder between machines 4-32
3.7 Dividing the parts 4-34
3.8 Combining the parts 4-36
4. Feeder Viewer Setting 4-38
4.1 Feeder Viewer Setting 4-38
4.1.1 Start of setting screen (menu selection) 4-38
4.1.2 Content of setting 4-39
4.2 Dump Station Arrangement Setting 4-40
4.2.1 Detailed explanation of operation 4-40
4.2.2 Settings 4-42
4.2.3 Error Message 4-44
4.2.4 Limitations 4-44
4.3 For 0 mount point parts 4-45
4.3.1 Setting 4-45
4.3.2 Display 4-46
4.3.3 Move parts 4-47
4.3.4 Multiply parts (Only at the feeder layout display) 4-48
4.3.5 Combine parts (Only at the feeder layout display) 4-48
4.3.6 Interference Check (Only at the feeder layout display) 4-49
4.3.7 Setup Assignment 4-49
5. Multi Lane Support 4-50
5.1 Production board list is extended 4-50
5.2
[Multiply Parts] and [Combine Parts] dialog are extended
4-50
5.3
“Production Plan”-“Plan Board Order Change” dialog is extended
4-51
5.4 “Optimizer”-“Optimizer Result” is extended 4-51