User Manual SIPLAC E HF Series 4 Setting up and commissioning Software Version SR.505.xx 05/2004 US Edition 4. 5 Setting up the placement machine 195 4.5.12.4 HF/3 axis unit (gant ry 3) - Connecting the plugs Æ Connect t…

100%1 / 358
4 Setting up and commissioning User Manual SIPLACE HF Series
4.5 Setting up the placement machine Software Version SR.505.xx 05/2004 US Edition
194
4.5.12.3 HF/3 axis unit (gantry 3) - electrical connection points
4
Fig. 4.5 - 18 HF/3 axis unit (gantry 3), back panel - electrical connection points
User Manual SIPLACE HF Series 4 Setting up and commissioning
Software Version SR.505.xx 05/2004 US Edition 4.5 Setting up the placement machine
195
4.5.12.4 HF/3 axis unit (gantry 3) - Connecting the plugs
Æ Connect the power cable as shown in the following diagram:
4
4
Æ Check the switch settings for S1
1: ON
2: ON
4.5.12.5 Fitting the axis unit
Æ Carefully lift the axis unit onto the rail in the extension kit.
Æ Make sure that you do not squash any cables.
Æ Push the axis unit into the extension kit as far as the stop.
Æ Connect the fan cable to the axis unit cable.
Æ Secure the axis unit with the fillister head screw.
Æ Insert the cover.
Æ Fix the grounding cable to the doors (item 2 in Fig. 4.5 - 14, page 188), as shown in Fig. 4.5 -
15 on page 190.
Æ Lock the doors.
HF/3 axis unit (gantry 3)
plug
Connecting cable
NOTE
Plug Cable
X21
X21
03009782
03009783
03009784
03009785
03009786 W1-W5
Secure connector with clips
X22
X22
03009802
03009803
03009804
03009805
03009807
Secure connector with clips
X4ur
X4ur 03009800 Snap connector into place
X4ut
X4ut 03009801 Snap connector into place
X1uo
X3uo
X5uo
X1uo
X3uo
X5uo
03009811
03009812
03009813
Insert as far as the stop
X1up
X3up
X5up
X1up
X3up
X5up
03009814
03009815
03009816
Insert as far as the stop
X9sq
X9sq 03010056 Screw tightly
4 Setting up and commissioning User Manual SIPLACE HF Series
4.5 Setting up the placement machine Software Version SR.505.xx 05/2004 US Edition
196
4.5.12.6 Fitting the covers
Æ Fix the grounding cable to each cover (item 5 in Fig. 4.5 - 14, page 188), as shown in Fig. 4.5
- 15 page 190.
Æ Fix each cover to the machine frame with 6 fillister head screws.
4.5.13 Fitting the main fault indicator
Æ Connect the main fault indicator cable to the cable of the basic machine.
Æ Fix the foot of the main fault indicator to the cross-beam of the basic machine.
4.5.14 Integrating the placement machine into the line
Æ Note the warning instructions described in section 4.5.2, page 162.
Æ The tools and equipment are listed in section 4.5.1, page 162.