00191297-02.pdf - 第33页

User Manual S-23 HM 1 Introduction Software Version S R.405.xx 05/99 Issue 1.10 Setting up the plac ement system 31 1.10.2 T ransport configuration an d transport ation The follo wing com ponents a re not i nstalled wh e…

100%1 / 422
1 Introduction User Manual S-23 HM
1.10 Setting up the placement system Software Version SR.405.xx 05/99 Issue
30
1.10 Setting up the placement system
1.10.1 Transport dimensions
1
Fig. 1.10 - 1 Dimensions of the placement system during transportation and setting up
A Points for attaching the fork-lift truck (fork length 1600 mm) 1
(1) Length 1587 mm
(2) Width 1921 mm
(3) Height 1836 mm
(4) Input conveyor
(5) Output conveyor
1
The PCB conveyor height is 830 mm ± 15 mm. 1
User Manual S-23 HM 1 Introduction
Software Version SR.405.xx 05/99 Issue 1.10 Setting up the placement system
31
1.10.2 Transport configuration and transportation
The following components are not installed when the placement system is delivered from the fac-
tory: 1
keyboards
–monitors
fault indicator lamps and
component tables
È Install the dismantled components for commissioning.
È Use a fork-lift truck to transport the placement system with a minimum fork length of 1600 mm.
È Attach the fork-lift truck only at the indicated points.
1.10.3 Quality of the foundation
È Ensure that
you set up the placement system on a firm and non-vibrating foundation.
the load bearing capacity per unit area of the foundation is greater than 1000 kg/m².
1.10.4 Compressed air supply
The pressure of the compressed air supply must be 5.5 bar min (max. permissible value
10 bar).
The compressed air must conform to the above specification.
This can be achieved with 1
oil-free compressors, e.g. Atlas, Copco type ZR4
compressed air washer/driers
micro-filters, series X, e.g. from Zander
1.10.5 Power supply
The power socket must be fused with the following fuse ratings:
3 x 16 A for 3 x 400 VAC 1
3 x 32 A for 3 x 208 VAC 1
1 Introduction User Manual S-23 HM
1.10 Setting up the placement system Software Version SR.405.xx 05/99 Issue
32
1.10.6 Setting up the placement system
È Raise the placement system using the fork-lift truck and adjust the feet until there is a gap of
830 mm between the top edge of the PCB conveyors and the bottom edge of the feet.
È Leave a gap of 1 to 3 mm between the PCB conveyors of the placement system.
È Use a cord pulled tight to ensure that all the placement systems are exactly in line with one
another.
È Adjust each placement system using a spirit level with an accuracy of 0.02 mm/m.
È Lock the feet in position.
È Check the placement system again using the spirit level and correct the settings, if necessary.
CAUTION
Make sure that you remove all the shipping braces from the placement system. 1
È Fit any components that were dismantled for dispatch.
È Connect all the electrical and pneumatic lines.
RISK OF DEATH
The electrical connection work MUST be carried out only by appropriately trained and certi-
fied personnel. 1