FX-3RA_SPE_EN.pdf - 第24页
- 20 - 5-2-5 Fe eder Indicator Function (FPI, Fa ctory - Set Option) This function uses LEDs to no tify an operator of the f eeder position to be checked if the stocked components run out or an feeder error occurs during…

- 19 -
5-2-2 Feeder Trolley Exchange Function (Factory-Set Option)
By using a feeder trolley, this function allows a group of feeders to be attached or removed
onto/from the main unit at a time. Since this function enables changeover from the current
feeders to the next feeders even during production of PWBs, it shortens the time required for
changeover.
Note: There are two different types of feeder exchange trolleys, for the electrical and the
mechanical feeders. They cannot be attached together on the same trolley. Use the
suitable trolley for each. Also, the special tape cutter is to be attached to the trolley for
the electrical feeders.
5-2-3 Rear Side Operation Unit (Factory-Set Option)
The liquid crystal display monitor, keyboard and mouse are attached on the rear of the main
unit allows you to perform the same operation as that of the front operation unit (this
operation unit is equipped with the front/rear operation switch).
5-2-4 Components verification System (CVS, Factory-Set Option)
This function is provided to inspect components to be placed before production and at the
restart after components run out, and detect errors such as component, polarity, feeder
setting position and other errors in advance. Up to six components are checked at the same
time.
Components applicable to this check:
Applicable component type
- Square chip
- Laminated ceramic capacitor
- Tantalum chip capacitor
- Aluminum electrolytic capacitor
- Chip film capacitor
- 2-pin diode
Inspection conditions
- Component that have two electrodes: one on the bottom and
another on the opposite side
- Component whose electrode distance is 10 mm or less
- Component whose external dimensions are □ 10.00 mm or less
- For a single measurement, a 0402 component or larger
components
- For simultaneous measurement, a 1005 component or larger
components (The longer side shall be 0.95 mm or longer.)
* Diodes are limited to general commutating diodes (other than light-emitting diodes and
zener diodes).
Check items
1) Resistance value Measurement range: 10 Ω to 1 MΩ
Measurement accuracy: ± 5 %
2) Electrostatic capacitance Measurement range:100 pF to 100 μF
Measurement accuracy: ± 20 %
3) Diode polarity Measurement range: Forward voltage 1.8 V or less
Open voltage 0 to 4.3 V or less
Nozzle
The following nozzles exclusively designed for the CVS are required to use the verification
function.
Standard nozzles: 500CVS, 501CVS,502CVS, 503CVS, 504CVS, 505CVS,509CVS

- 20 -
5-2-5 Feeder Indicator Function (FPI, Factory-Set Option)
This function uses LEDs to notify an operator of the feeder position to be checked if the
stocked components run out or an feeder error occurs during production of PWBs. This
feature shortens the time spent for replacing a feeder and improves the operability of the
KE-2000 series of products.
5-2-6 SOT Direction Check Function (Factory-Set Option)
This function uses the OCC to check the component supply angle by placing a 3-terminal
SOT component on the SOT direction check table before production or the restart after
components run out.
Applicable components:
- Component dimensions: 1.6 mm to 4.0 mm x 4.0 mm
- Electrode dimensions: Length 0.2 mm to 1.0 mm
Width 0.1 mm to 1.0 mm
5-2-7 Longer sized PWB in X axis (Factory-set option)
The PWB size in the X-direction can be extended up to 800 mm by split clamping system
with HMS. As a result, the production of a long PWB used for the LED lighting etc. is enabled.
(Shape reference only)
Sizes of handling a long PWB: (Unit: mm)
Direction
Minimum
size
Maximum size
Standard-
clamping
Split
clamping
L-size specification
X 50 410 800
Y 50 360
L-Wide size
specification
X 50 510 800
Y 50 360
XL-size specification
X 50 510 800
Y 50 460
- 21 -
5-2-8 Solder Recognition Lighting (Factory-set option)
The solder print can be recognized as BOC mark when there is no BOC mark on the PWB or
the circuit.
When the twice-fed long PWB is transported, the placement pad etc. on which the solder
print is performed at the placement of components in the range where the BOC mark is not
prepared can be used as BOC mark.
* Satisfactory placement accuracy might not be obtained in the solder print because shape
as the mark is not clear.
5-2-9 Component Quantity Control (Option)
The lot of the product (PWB) where the components (LED components etc.) are placed is
managed.
When a PWB is loaded, it is checked whether components required to complete a
production of the PWB remain in the feeders with components in different lots not being
mixed in a PWB.
If components are not enough, a warning is displayed before the placement starts.
5-2-10 Connector Bracket (Factory-set option Designed for the Fixed Bank)
This is a unit necessary for connecting devices that requires a power supply such as an
adhesive tape feeder and an IC collection belt to the mounter.
5-2-11 Handheld Operating Device (HOD: Factory-set option)
FX-3RA allows you to check the recognized mark image on the operation screen or perform
various teaching operations. In addition, if an experienced user of any of conventional
mounters does not want to change the operability of the mounter, or if you want to make the
operability of the entire line consistent, you can use the HOD as conventionally.