00195089-0102_AI_Vakuumpumpe_X-Serie_60X_DE+EN.pdf - 第77页

Assembly Instructions SIPLACE Vacuum Pump Ausgabe 07/2006 73 2.7.1 Connect Portal Distributor 2 2 Bef ore any work is perf or med the machine – after being prope r ly shut down – must be tur ned off at the main s witch a…

100%1 / 130
Assembly Instructions SIPLACE Vacuum Pump
Ausgabe 07/2006
72
Fig. 2.7.1 Pneumatic unit (in starting position)
(1) Portal distributor (top)
(2) Plate for vacuum distributor block (on the side)
(3) Pneumatic unit (bottom)
2
2
Assembly Instructions SIPLACE Vacuum Pump
Ausgabe 07/2006
73
2.7.1 Connect Portal Distributor
2
2
Before any work is performed the machine – after being properly shut down – must be turned off
at the main switch and separated from the power system. Thereafter the compressed air supply
must be also turned off at the compressed air unit’s main valve in the machine stand. The air
supply must then be ventilated by activating the needle valve on the compressed air unit.
: T
urn off the placement machine and disconnect it from the power system.
: Op
en the compressed air supply’s door
(the connections for Portal 3 and 4 are located here)
Fig. 2.7.2 Portal distributor, pneumatics side (with dummy plug Portal 3+4, starting position)
Assembly Instructions SIPLACE Vacuum Pump
Ausgabe 07/2006
74
: Open the power supply’s door
(the connections for Portal 1 and 2 are located here)
Fig. 2.7.3 Portal distributor, power supply side (with dummy plug Portal 1+2, starting position)
: Close the main compressed air shut-off valve.
: Close the shut-off valve for the placement machine.
: Wait until the pressure has dissipated.