QP132三级参考手册.pdf.pdf - 第127页
Chapter 1 1 PA M

Notes:
Chapter 10 10.2 Training Evaluation
Edition 1.0 10-8 QP-132 Level 3 Tutorial

Chapter 11
PAM

11.1 PAM
Note: The machine needs to warm up before performing PAM. Run the machine in Production
or idle modes for more than 3 hours if possible.
Idle program: QP1_IDLE_DIRECT1
Product mode: IDLE-2
It is possible to idle the machine without removing the PFUs. Ensure there are no feeders
at the pick-up locations.
11.1.1 Nozzle A, B, C and D
1. Enter zero for Center Offset in Proper data. Transmit to the machine and
re-boot.
MQ3ACOAX [PM1]Center Offset A_X
MQ3ACOAY [PM1]Center Offset A_Y
MQ3ACOBX [PM1]Center Offset B_X
MQ3ACOBY [PM1]Center Offset B_Y
MQ3ACOCX [PM1]Center Offset C_X
MQ3ACOCY [PM1]Center Offset C_Y
MQ3ACODX [PM1]Center Offset D_X
MQ3ACODY [PM1]Center Offset D_Y
MQ3ACOEX [PM1]Center Offset E_X
MQ3ACOEY [PM1]Center Offset E_Y
MQ3ACOFX [PM1]Center Offset F_X
MQ3ACOFY [PM1]Center Offset F_Y
2. Use the following programs.
QP1_PAM_YOKO_ALL.PGO
PAM_ALL.PGO
3. Enter zero for Heat expansion in Proper data (Transmit to the machine
and re-boot).
MQ3TEC or MQ3TMCHK Thermal Expansion Compensation = 0
(OFF)
4. Attach 1.3 diameter nozzles to holders, A, B, C and D.
5. Set PAM parts to the feeders.
* Double paper feeder with 4 mm pitch
* Set PAM parts to the left and right. Load feeders to PFU slots 3
and 5.
* Load 2 feeders for each PM. (Prepare 32 of them.)
* Clamp the PFU to the machine.
6. Adjust the IN and OUT manipulators and conveyor width.
Chapter 11 11.1 PAM
Edition 1.1 11-1 QP-132 Level 3 Tutorial