DECAN_S1_Administrator′s_Guide(Eng_Ver1.5)_Print.pdf - 第580页

18-2 Next Generation, Multi-Functional Plac er DECAN S1 Administrator’s Guide 18.1.1. Product Figure18.1 “Production” tab dialog  <Build Info> group Indicate various informatio n related to PCB production.  <T…

100%1 / 632
18-1
Production Information Management
Chapter18. Production Information
Management
18.1. Production Information Management [Pd. Info]
Clicking the ‘Production Information’ submenu button of the ‘Production’ menu will
display the following dialog box.
Memo The shape of the conveyor displayed on the screen may differ
depending on the option.
When “Plc. Info” submenu is clicked on, the following dialog box is displayed.
18-2
Next Generation, Multi-Functional Placer DECAN S1 Administrator’s Guide
18.1.1. Product
Figure18.1 “Production” tab dialog
<Build Info> group
Indicate various information related to PCB production.
<Total Board>
Indicates the total number of produced PCBs.
<Skipped Array>
Indicates the total amount of PCB Arrays and PCBs that have been skipped as a
18-3
Production Information Management
result of ‘Defect’ indicated on the bad mark.
<Worked Array>
Indicates the total number of PCB’s normally worked.
<Statistics> group
Displays the information about placement time. Clicking the right button will
display different types of information. (sec/board board/hour CPH)
<Peak Build Cycle>
sec/board
The minimum time that was taken to work on one PCB is displayed in the
second unit. [Peak Build Cycle Time (sec/board) ]
CPH
Indicates the number of PCBs that are expected to be produced in an hour
based on the Peak Build Cycle (sec/board).
Board/Hour
Indicates the number of parts that are expected to be placed in an hour based
on the Peak Build Cycle (sec/board).
<Mean Build Cycle>
sec/board
The average required time that was taken to work on one PCB is displayed in
the second unit. [Peak Build Cycle Time (sec/board) ].
CPH
Indicates number of parts placed in an hour after the initial PCB is fed to the
work station.
Board/Hour
Indicates number of PCBs produced in an hour after the initial PCB is fer to
the work station.
<Previous Cycle>
Previous Cycle Time =Build Time +Transfer Time
sec/board
Indicates the required time in the “second” unit until the next PCB is fed since
the most recently produced PCB was fed to the work station. [Previous Cycle
Time (sec/board) ]
CPH
Indicates the number of PCBs that are expected to be produced in an hour
based on the Previous Cycle Time (sec/board).