User Manual Test Program SITEST 4 Mapping Software Version 405.xx Issue 01/99 4.2 PCB Mapping 4 - 7 4.2.1 Mapping Run for Both Gantries (SIPLA CE 80S-20/S-23) ● If a dual conve yor is i nstalled , activate the radi o but…

100%1 / 168
4 Mapping User Manual Test Program SITEST
4.2 PCB Mapping Software Version 405.xx Issue 01/99
4 - 6
The following functions are available in the "PCB mapping" display:
Right to select the right conveyor track
Left to select the left conveyor track of a dual conveyor
Start to start the mapping run
Continue to continue mapping
Display mapping data to display the mapping data determined
PCB mapping both gantries to perform the mapping run for both gantries of the SIPLACE
80S-20/S-23 (switching from one gantry to the other is carried out
automatically. The mapping run is first carried out for gantry 1,
then for gantry 2).
Check run to approach the mapping positions for checking purposes (one
position per row)
Display check run data to display the setpoint positions calculated during the mapping
check and the deviations measured
(taking into account the correction values from the measured
values file, the rotational offset angle, the gantry offset, etc.)
If a dual conveyor is installed, activate the appropriate radio button
Right
or
Left
in the "Conveyor track"
field, depending on which conveyor track you wish to perform the mapping.
If you wish to change the resolution that is used to determine the data during the mapping run, click on the
"Resolution" field.
The following options are available:
standard 13 x 11 measuring points will be determined with a fiducial spacing of 40 mm
high 25 x 22 measuring points will be determined with a fiducial spacing of 20 mm
Select the option for the desired resolution.
NOTE
Each mapping plate is delivered with a diskette containing a measured values file. This file contains the
values of the deviation of the measuring points from their setpoint positions. These values are required for
PCB mapping for correction purposes. Only after the plate number (see below) has been entered can the
PCB mapping run be started. The measured values file is read in from diskette upon the start of the
mapping run. 4
Place the diskette supplied with the mapping plate into the floppy drive of the control unit.
Enter the number of the mapping plate in the "No. of mapping plate" editing field.
User Manual Test Program SITEST 4 Mapping
Software Version 405.xx Issue 01/99 4.2 PCB Mapping
4 - 7
4.2.1 Mapping Run for Both Gantries (SIPLACE 80S-20/S-23)
If a dual conveyor is installed, activate the radio button for the conveyor track for which mapping is to be
performed.
Click on the
PCB mapping both gantries
button and follow the directions displayed on the screen.
The mapping run is performed for gantry 1. After the mapping run, gantry 1 is automatically moved to
the park position and subsequently the mapping run for gantry 2 is performed.
After the mapping run has been completed without any errors, the data thus determined is automatically
saved.
If a dual conveyor is installed, activate the radio button for the conveyor track for which mapping has not
yet been performed.
Click on the
PCB mapping both gantries
button and follow the directions displayed on the screen.
The mapping run is performed for both gantries on the selected conveyor track.
After the mapping run has been completed without any errors, the data thus determined is automatically
saved.
To review the mapping data for the current conveyor track, click on the
Display mapping data
button.
The data determined is displayed in a dialog box.
Close the dialog box by clicking on
OK
.
Click on the
Check run
button if you wish to check whether the values determined are correct. The
check run is now started.
Click on the
Display check run data
button.
The data determined during the check run is displayed in a dialog box.
Close the dialog box by clicking on
OK
.
Click on the icon to return to the main view.
4.2.2 Mapping Run for the Active Gantry
If a dual conveyor is installed, activate the radio button for the conveyor track for which mapping is to be
performed.
Click on the Start button and follow the directions displayed on the screen.
The active gantry now performs the mapping run.
If a dual conveyor is installed, activate the radio button for the conveyor track for which mapping has not
yet been performed.
Click on the Start button again and follow the directions displayed on the screen.
The active gantry performs the mapping run on the selected conveyor track.
Click on the icon to return to the main view.
4 Mapping User Manual Test Program SITEST
4.2 PCB Mapping Software Version 405.xx Issue 01/99
4 - 8
In the main view SIPLACE 80S-20/S-23 click on the icon to switch to the "Gantry 2" display.
CAUTION
On no account must the position of the mapping plate(s) be changed when switching from one gantry
to the other.
Click on the icon to switch to the "PCB mapping" display.
If a dual conveyor is installed, activate the radio button for the conveyor track for which mapping is to be
performed.
Click on the
Start
button and follow the directions displayed on the screen.
The mapping run is performed for gantry 2.
After the mapping run has been completed without any errors, the data thus determined is automatically
saved.
If a dual conveyor is installed, activate the radio button for the conveyor track for which mapping has not
yet been performed.
Click on the
Start
button again and follow the directions displayed on the screen.
Gantry 2 performs the mapping run on the selected conveyor track.
After the mapping run has been completed without any errors, the data thus determined is automatically
saved.
Remove the mapping plate(s) for PCB mapping.
Click on the icon to return to the main view.
NOTE
PCB mapping can also be performed using the
Calibrate machine...
-->
PCB mapping
function (see chapt.
3, section 3.2). On SIPLACE 80S-20/S-23 machine types, this function is used to perform automatically the map-
ping procedure, first for gantry 1 and then for gantry 2.
If a dual conveyor is installed on the machine, mapping is performed first on the right and then on the left con-
veyor track. 4
CAUTION
As the data will be overwritten during PCB mapping, it is necessary that RV mapping and IC mapping
(SIPLACE 80F
4
/F
5
) be repeated after every PCB mapping operation. 4