00191332-01.pdf - 第157页

User Manual Test Program SITEST 4 Mapping Software Version 405.xx Issue 01/99 4.3 RV Mapping 4 - 9 4.3 R V Mapping NOTE Prior to the perfo rmance of RV mapp ing ma ke sure tha t PCB mapping ha s alrea dy been car ried ou…

100%1 / 168
4 Mapping User Manual Test Program SITEST
4.2 PCB Mapping Software Version 405.xx Issue 01/99
4 - 8
In the main view SIPLACE 80S-20/S-23 click on the icon to switch to the "Gantry 2" display.
CAUTION
On no account must the position of the mapping plate(s) be changed when switching from one gantry
to the other.
Click on the icon to switch to the "PCB mapping" display.
If a dual conveyor is installed, activate the radio button for the conveyor track for which mapping is to be
performed.
Click on the
Start
button and follow the directions displayed on the screen.
The mapping run is performed for gantry 2.
After the mapping run has been completed without any errors, the data thus determined is automatically
saved.
If a dual conveyor is installed, activate the radio button for the conveyor track for which mapping has not
yet been performed.
Click on the
Start
button again and follow the directions displayed on the screen.
Gantry 2 performs the mapping run on the selected conveyor track.
After the mapping run has been completed without any errors, the data thus determined is automatically
saved.
Remove the mapping plate(s) for PCB mapping.
Click on the icon to return to the main view.
NOTE
PCB mapping can also be performed using the
Calibrate machine...
-->
PCB mapping
function (see chapt.
3, section 3.2). On SIPLACE 80S-20/S-23 machine types, this function is used to perform automatically the map-
ping procedure, first for gantry 1 and then for gantry 2.
If a dual conveyor is installed on the machine, mapping is performed first on the right and then on the left con-
veyor track. 4
CAUTION
As the data will be overwritten during PCB mapping, it is necessary that RV mapping and IC mapping
(SIPLACE 80F
4
/F
5
) be repeated after every PCB mapping operation. 4
User Manual Test Program SITEST 4 Mapping
Software Version 405.xx Issue 01/99 4.3 RV Mapping
4 - 9
4.3 RV Mapping
NOTE
Prior to the performance of RV mapping make sure that PCB mapping has already been carried out.
4
Carry out the preparatory steps as described in section 4.1.
Additional prerequisites are:
Segment offset II (RV-PCB camera offset) must already have been determined for both gantries.
The calibration tool must be in the calibration tool pocket.
The calibration tool position must already have been determined.
On segment 1 of each 12-nozzle revolver head a type 756 nozzle must be attached and
and a nozzle of the type 720 to the 6-nozzle revolver head.
In the main view click on the icon (for revolver head 1 of SIPLACE 80S-20/S-23) or on the icon
(for the revolver head of SIPLACE 80F
4
/80F
5
)
to switch the screen display to the "RV head" display
(see Fig. 0.3.4).
Click on the icon to switch to the "RV mapping" display.
4 Mapping User Manual Test Program SITEST
4.3 RV Mapping Software Version 405.xx Issue 01/99
4 - 10
Fig. 4.3.1 "RV mapping" Display
The following functions are available in the "RV mapping" display:
Right to select the right conveyor track
Left to select the left conveyor track of a dual conveyor
Start to start the mapping run
(field "RV mapping of selected gantry")
Continue to continue mapping
Display mapping data to display the mapping data determined
Start to perform the mapping run for both gantries of the SIPLACE
(field "RV mapping both gantries") 80S-20/S-23 (switching from one gantry to the other is carried out
automatically. The mapping run is first carried out for gantry 1, then
for gantry 2).