100 P7.5 Are personnel qualified for their respective tasks and are responsibilities defined? Minimum requirements relevant for assessment Examples for implementation It must be determined which responsibilities, duties …

99
P7.4* In case of complaints, are failure analyses carried out and corrective
actions implemented effectively?
Minimum requirements relevant for assessment
Examples for implementation
A complaints process that meets the customer re-
quirements is followed in case of 0-km and field
complaints.
Analysis procedures must be defined. The neces-
sary personnel and material resources are available
to ensure punctual processing. The deadlines
agreed upon with the customer must be met. In
case of non-conformities, the customer has to be
informed.
In case of field complaints, a field failure analysis
must be carried out according to the customer re-
quirements (e.g. VDA Field Failure Analysis).
In case of suppliers appointed by the customer (di-
rected suppliers), interface agreements are taken
into consideration.
• Process for processing com-
plaints and field failure analy-
sis process
• Internal/external analysis fa-
cilities (laboratories, test and
inspection facilities, person-
nel)
• Use of problem-solving
methods (8D)
• Flow of information to the
customer in the case of non-
conformities
• Knowledge databases, les-
sons learned
• Quality control loop
• Risk analysis (e.g. FMEA,
HARA)
• Access to the necessary re-
lease documents (e.g. PPA)

100
P7.5 Are personnel qualified for their respective tasks and are responsibilities
defined?
Minimum requirements relevant for assessment
Examples for implementation
It must be determined which responsibilities, duties
and authorizations each employee has in their re-
spective field of work.
Training needs must be determined and imple-
mented individually, based on the tasks.
The employees are familiar with the product and
the consequences of incorrect execution of work for
the supply of parts and the quality of the final prod-
uct.
• Organizational chart and es-
calation procedures
• Evidence of knowledge of:
the product/the specifica-
tions/ special customer re-
quirements
• Standards/legislation (prod-
uct liability)
• Intended use
• Failure analysis
• Evaluation methods (e.g. au-
dits, statistics)
• Quality techniques (e.g. Pa-
reto, 8D Method, cause and
effect diagram, “5 Whys”
method)
• Knowledge of foreign lan-
guages

101
8 Glossary and list of abbreviations
Definitions and terms from the VDA publications are provided in the overarch-
ing online glossary of the VDA QMC:
https://vda-qmc-learning.de/module/glossar/glossar.php
Abbrevia-
tion
Explanation
AIAG
Automotive Industry Action Group
aSPICE
automotive SPICE (Software Process Improvement and Capability Determination)
CAx
Computer-Aided x
CMMI
Capability Maturity Model Integration
DIN
German Institute for Standardization (Deutsches Institut für Normung e. V.)
E
Dn
Compliance level of the service process element (D2, D3, …, D7)
ESD
electrostatic discharge
E
G
Overall compliance for the Process Audit
E
G(PGn)
Overall compliance for each product group
E
n
Compliance level of a process step
E
Pn
Compliance level of a process element (P2, P3, …, P7)
E
U1
Sub-element of P6 or D6: Process Input
E
U2
Sub-element of P6 or D6: Work carried out
E
U3
Sub-element of P6 or D6: Personnel resources
E
U4
Sub-element of P6 or D6: Material resources
E
U5
Sub-element of P6 or D6: Efficiency
E
U6
Sub-element of P6 or D6: Process output
OK
OK
IEC
International Electrotechnical Commission
Inmetro
National Institute of Metrology, Standardization and Industrial Quality
ISO
International Organization for Standardization
n.e.
not evaluated
NOK
Not OK