63 P4.4* Are the required proofs of capability and releases for product and pro- cess development available? Minimum requirements relevant for assessment Examples for implementation The releases and proofs of capability …

100%1 / 107
62
P4.3 Are the material/immaterial resources available and are they suitable to
ensure product and process implementation?
Minimum requirements relevant for assess-
ment
Examples for implementation
A process to determine resources has been imple-
mented.
The provision of resources refers to the availability
of buildings, measuring and inspection equipment,
laboratory equipment, machinery, plants, IT sys-
tems and infrastructure as well as their utilization.
Processes that have been outsourced must be
taken into account.
Regular needs assessment must be carried out
during product and process development with re-
gard to potentially emerging bottlenecks and addi-
tional requirements.
Material/immaterial resources are available for all
phases of product and process implementation,
and the requirements for series production have
been derived.
Equipment for in-house transport, such as packag-
ing and special load carriers, has been defined
and is available in sufficient quantities.
Product/process development
Customer requirements
Technical interface to the cus-
tomer and suppliers
ERP systems
Supporting processes, e.g.
from logistics and IT
Product development
Resources for verification and
validation
Test setups, e.g. Hardware in
the Loop (HIL), test boards,
evaluation boards
Development tools, provision
of the tool chain for software
development
Process development
Facility planning
Facility layout
Release of plants and ma-
chines, line clearance
Quantities and throughput
times
Transport routes
Transport, containers, storage
Capacity before the start of
series production (initial stock)
63
P4.4* Are the required proofs of capability and releases for product and pro-
cess development available?
Minimum requirements relevant for assessment
Examples for implementation
The releases and proofs of capability are available
for all items, assemblies, software versions and
purchased products/services in accordance with
development schedules.
The capability of the measuring and inspection
equipment has been proven.
The material data has been confirmed and re-
leased.
The measures from the risk analyses (e.g. FMEA,
HARA) have been included in the product and pro-
cess implementation, and their effectiveness has
been confirmed.
In case of products with integrated (embedded)
software, the software-related aspects according to
VDA Volume 2 have to be taken into account.
The production process and product approval
(PPA) must be available on the agreed date. The
tolerances of process parameters for the production
of special characteristics have to be verified.
Product/process development
PPA results, in particular
confirmation of conformity
with statutory and regulatory
requirements
PPA results for purchased
products and services
Development releases from
customers
Process development
Process parameters and
their tolerances
Confirmed logistics concept
(e.g. suitability of packaging
through sample shipping)
Proofs of capability
Capacity studies
Plant and tool releases
Software
Recommendations for use
(release notes) for each re-
lease
Release of third-party soft-
ware and FOSS in accord-
ance with customer require-
ments
Provision of test results and
test evaluations
64
P4.5 Have the planned procurement activities been implemented?
Minimum requirements relevant for assessment
Examples for implementation
The planned procurement activities have been im-
plemented. This includes risk assessments, the
project plan, the maturity level, releases and ob-
serving deadlines.
The planning activities according to the risk classifi-
cation have been implemented; measures have
been derived and their implementation is moni-
tored.
The required proofs of capability and releases (pro-
cess and product release) for the purchased prod-
ucts and services are available in accordance with
the project schedule. The material data has been
confirmed and released.
The relevant project-specific customer require-
ments have been taken into account.
The processes for ensuring customer care/cus-
tomer satisfaction/customer service as well as field
failure analysis have been established.
PPA release
FMEA, HARA
VDA 6.3 audit, potential ana-
lysis etc.
Releases, evidence and per-
formance tests in accord-
ance with the coordinated
PPA procedure
NTF process, triggering crite-
ria for stress tests have been
defined
Spare parts supply concepts
Contingency plans
Interface agreement (ser-
vices according to DIA or in-
terface agreement)
Sub-supplier management
by auditee for off-the-shelf
components, engineering as-
signments (no personnel
leasing)
Reference to the ASPICE
Acquisition Process Group,
ACQ2, ACQ.3, ACQ.4