79 Process element P6: Production process analysis P6.2 Are all production processes controlled? Process management P6.2.1 Are the requirements in the production control plan complete and have they been effectively imple…

100%1 / 107
78
P6.1.5* Are product or process changes during series production tracked and
documented?
Minimum requirements relevant for assess-
ment
Examples for implementation
Changes to the product and the production pro-
cess are implemented in accordance with the
change management described. Changes to the
product and process are agreed upon with the
customer, approved and released (including soft-
ware changes) in accordance with customer re-
quirements. A PPA must be carried out. The his-
tory of change statuses must be fully traceable.
The correct, released version of the material / soft-
ware must be used.
After changes have been made, it must be
checked whether the risk analyses need to be up-
dated.
Trigger matrix in accordance
with VDA Volume 2 or cus-
tomer specifications
Documented release of a
change
Cross-functional evaluation
prior to changes
Change history/parts history
(also for software)
Design and process FMEA
Operation management in
case of changes
Pre-production
Unique software identifier,
software integrity (build num-
ber, hash key)
79
Process element P6: Production process analysis
P6.2 Are all production processes controlled?
Process management
P6.2.1 Are the requirements in the production control plan complete and have
they been effectively implemented?
Minimum requirements relevant for assess-
ment
Examples for implementation
The production and inspection documents are
complete and are based on the production control
plan.
The data relating to released machinery/tools/aids
must be noted in the production control plan
and/or the manufacturing and inspection docu-
ments.
The documents must be accessible close to the
work-station.
Required measures (reaction plan) for process
disturbances are described in the production con-
trol plan and are implemented and documented.
Process parameters influencing product character-
istics/quality must be fully stated.
Tolerances must be stated for process parameters
and inspection characteristics.
The control limits in process control charts are de-
fined, identifiable and plausible.
Non-conformities and initiated measures regarding
process requirements and inspection characteris-
tics must be documented.
Conditions governing rework are specified, assess
as part of the risk analysis and secured within the
process (parts identification; repeat inspection
etc.).
Inspection characteristics, in-
spection equipment, inspec-
tion methods, inspection fre-
quencies, inspection cycles
and requalification
Data regarding ma-
chines/tools/aids (identification
numbers), process parame-
ters and tolerances (pressure,
temperatures, times, speeds
etc.)
Work instructions (including
reworking)
Inspection instruction
80
P6.2.2 Are production processes released?
Minimum requirements relevant for assessment
Examples for implementation
A process-specific release inspection for first
piece/last piece and repeat release was carried out
and documented.
A release is necessary for the product and the pro-
cess and must be carried out and documented by
authorized employees using acceptance criteria.
Non-conformities and initiated measures are docu-
mented.
At the time of release, the necessary reference and
boundary samples must be available.
Criteria for triggering a repeat release must be de-
fined e.g. after an interruption of production.
If production is continued after the collection of in-
spection parts, these products must be accessible
until the inspection parts are released.
Release of a batch, includ-
ing repeat release
First piece /last piece and
repeat release
Tooling diagrams/reference
parts/installation parts (e.g.
defect identification)
Possible triggering criteria
for a repeat release:
Production interruption
(e.g. night time
in two-shift operations,
tool changes, material/
batch/product change)
Repair, tool change,
changed setting data
Release of reworked parts