00191374-04.pdf - 第166页
8 Other Instructions Adjust ment Inst ruc ti ons SI PLA CE HS- 50 8.1 Jumper Board Edition 12/00 166

Adjustment Instructions SIPLACE HS-50 8 Other Instructions
Edition 12/00 8.1 Jumper Board
165
2WKHU,QVWUXFWLRQV
-XPSHU%RDUG
8 Other Instructions Adjustment Instructions SIPLACE HS-50
8.1 Jumper Board Edition 12/00
166

9 Calibration of SIPLACE HS-50 (incl. SITEST version 501.xx) Adjustment Instructions SIPLACE HS-50
Softwareversion SR.501.xx Edition 12/00
167
WARNING
During some of the procedures the gantries will traverse.
Therefore, before you begin with any of these procedures make sure that you and everyone else stay
physically clear of the travel range of the gantries. 5,6.2),1-85<
Also, ascertain, that no objects are in the way. ILJ
NOTE
Before you begin with the calibration, you must reference the heads and the gantries.
During calibration, unused gantries will automatically be traversed to their parking position.
For a complete calibration of the placement system, the SITEST test program provides the function
&DOLEUDWHPDFKLQH which allows you to start all calibration functions from the menu "Calibrate entire
machine".
Calibration functions will be performed for these functions, for gantries 1, 2, 3 and 4.
(TXLSPHQWDQG7HVWLQJ7RROV
– Test program SITEST, version 501.xx
– Calibration tools
– Nozzles, type 956
– Gauge
– PCB, width 100 mm
&DOLEUDWLRQRI6,3/$&(+6
LQFO6,7(67YHUVLRQ[[