00197461-01_AI_Portaltausch_X-Serie_S_INTERN_de_en.pdf - 第64页

Installation Installing the Gantry 64 Gantry Exchange Portaltausch 3.4 3 . 4 I n s t a llin g t h e G a n t r y Installing the Gantry Fitting the gantry Fitting the incremental encoder and motor cable ► Fit the increment…

100%1 / 76
Installation
Converting Attached Parts
Gantry Exchange Portaltausch 63
Head adapter HCU with protective plate
Read the relevant section in the service manual.
The PCB Camera
Read the relevant section in the service manual.
Hose on the silencer
Disconnect the hose on the silencer from the old gantry and fit it onto the new gantry.
CAUTION
Connectors, HCU
Make sure that the head adapter board is connected to the head interface via a press-fit
connection from below.
Do not loosen the two screws fastening the HCU.
CAUTION
Loctite 241
Secure the screws fastening the PCB camera with Loctite 241.
Installation
Installing the Gantry
64 Gantry Exchange Portaltausch
3.4
3.4 Installing the Gantry
Installing the Gantry
Fitting the gantry
Fitting the incremental encoder and motor cable
Fit the incremental encoder. For details, refer to the service manual.
Pull the protective foil off the scale.
If there is a corresponding label on the head plate, re-
move this label (1).
Check the contact surfaces (1) on the new gantry and
trim these if needed with a dressing stone.
Carefully lift the gantry into the machine and fasten it.
When inactive, one screw at the top (e.g. (9)) is
enough to hold the gantry.
While doing this, press the gantry downwards, onto
the contact surface of the guide trolley.
Tighten the screws with a torque of 9.5 Nm. Proceed
as shown, in the order from (1) to (16).
M6x14 screws are used on the top of the gantry.
M6x22 screws are used at the bottom of the gantry.
Replace the threaded bolt with a screw.
CAUTION
Clean the read surface, air gap, cable duct
Clean the reading surface of the incremental encoder with a cloth and ethanol or with a Q
tip.
Fit the incremental encoder with a gap of 0.8 mm to the scale.
Make sure that the axes can be moved without damaging the cables.
Installation
Installing the Gantry
Gantry Exchange Portaltausch 65
Temperature sensor cable
Fix the cable of the temperature sensor into place. Read the relevant section in the service manual.
Fitting the cable harness and the hoses
Fit the cable harness and the corresponding hoses to the gantry. For details, refer to the service
manual.
Connect the cable from the incremental encoder and
temperature control to the gantry interface (1) (see
also "4.1.1 Gantry interface" [ 69]).
(2) Connect the motor cable to the gantry interface.
First, use a side cutter to remove the lug (3) on the
connector (2) from the side facing the middle of the
gantry interface . Fasten the cable to the other lug
with a cable tie.
Continue to secure the cable so that it does not get
caught in the trailing cable running next to it.
CAUTION
Cable routing
Make sure that the end stops (red buffers) do not rub against the cable of the board.
Make sure that the cable for the board can not collide with the X axis end stopper.
CAUTION
Always handle the trailing cable with care
If a vacuum pump is fitted, also observe the relevant assembly instructions [00196845-xx].
Always handle the new trailing cable with care.
Make sure that the flat ribbon cable and the pneumatic hoses are not rubbed against any
parts or folded. Look out for sharp edges.
Clean the trailing cable contact surface on the machine base with a dry cloth.
Carefully insert the trailing cable into the prescribed position. Make sure you do not twist it.
Take care of the rubber mat under the holder.
Check that the power track chain runs parallel to the machine base. Move the gantry back
and forth.
Secure with screws with Loctite 243.
If it is difficult to push the hoses onto the tubes, moisten these first with ethanol or isopro-
panol (IPA).
Fit the board cover. Make sure that you do not cause a short circuit.