4OM-1505-004_w.pdf - 第79页
4OM-1505 1-28 3. Maintenance Spots : Chap.1 R Conveyor Upper Surface of PCB T ransfer Belt Every Day Cleaning Remove solder paste and dust with a vacuum cleaner . Linear Guide Every Month Cleaning Clean the stopper with …

4OM-1505
1-27
3. Maintenance Spots : Chap.1
3.2.5 Conveyor Section
Upper Surface of PCB Transfer
Belt
Every Day Cleaning
Remove solder paste and dust
with a vacuum cleaner.
L Conveyor
Linear Guide
Every Month Cleaning
Clean the stopper with an oiled rag.
Do not leave any waste
threads after cleaning.
Every 5 years Lubrication
Apply grease with a brush or a
spatula.
Linear Guide
Note
F4A16
0906-001

4OM-1505
1-28
3. Maintenance Spots : Chap.1
R Conveyor
Upper Surface of PCB Transfer
Belt
Every Day Cleaning
Remove solder paste and dust
with a vacuum cleaner.
Linear Guide
Every Month Cleaning
Clean the stopper with an oiled rag.
Do not leave any waste
threads after cleaning.
Every 5 years Lubrication
Apply grease with a brush or a
spatula.
Linear Guide
Note
F4A17
0906-001

4OM-1505
1-29
3. Maintenance Spots : Chap.1
3.2.6 PCB Chuck Section
Upper Surface of PCB Transfer
Belt
Every Day Cleaning
PCB Positioning Side and
Upper Surface
Every Day Cleaning
Upper Surface Section of
Backup Table
Every Week Cleaning
Remove solder paste and dust
using a cloth soaked in industrial
alcohol. In the case that solder
paste can not be removed, scrape it
and clean it again using a cloth
soaked in industrial alcohol.
Remove solder paste and dust
using a cloth soaked in industrial
alcohol. In the case that solder
paste can not be removed, scrape it
and clean it again using a cloth
soaked in industrial alcohol.
Remove solder paste and dust
using a cloth soaked in industrial
alcohol. In the case that solder
paste can not be removed, scrape it
and clean it again using a cloth
soaked in industrial alcohol.
F4A18
0906-001