CP6S-PAM操作手册.pdf - 第20页

Notes: 2. Boot-up in P AM Mode V ersion 3.0 2-2 CP-6 Series P AM Operation

100%1 / 69
2. Boot-up in PAM Mode
Insert the PAM software ROM card and reset start the machine. The machine will boot
up in the PAM mode. Transmit the Proper data, status data, and the programs once the
machine reboots. Reboot the machine after transmitting the data.
The display shown above is the first screen in the PAM mode. "PAM Mode"
displays on the screen if the machine boots up in the PAM mode.
The Proper data measurements for the machine and the Mark camera (excluding
those for station 11) must be complete prior to using the PAM software.
2. Boot-up in PAM Mode
Version 3.0 2-1 CP-6 Series PAM Operation
Notes:
2. Boot-up in PAM Mode
Version 3.0 2-2 CP-6 Series PAM Operation
3. ST11 Proper Data Setting Procedure
Follow the procedures listed below to adjust the Proper data for station 11.
Procedures
1. Replace the nozzles
Install 1.3 mm nozzles (with 12 mm reflective disks) in all the nozzle holders.
2. Mounting the Cartridge
PAM requires only 1 cartridge for a paper tape (width: 8mm, feed pitch: 4mm). The
PAM dummy parts reel is set on the cartridge, and the cartridge is then mounted on
device number 1.
3. Loading the PAM Measurement Board
Use the [LOADER] command to load the PAM measurement board.
Note: In the PAM mode, the [LOADER] command must always be used to load and unload the
board.
4. Nozzle Center Measurement
Perform a nozzle center measurement. The Nozzle Assignment Table should be such
that nozzles with bend amounts of 0.05mm or more are skipped.
Replace the unacceptable nozzles, then repeat the nozzle center measurement using the
following command sequence:
[SET] —> [MANUAL] —> [NOZZLE] —> [CENTER] — —> START button
Note: Refer to the “The Need for Station 11 Proper Data Calibrations” section of Chapter 1 for
information concerning the necessity of nozzle center measurements.
3. ST 11 Proper Data Setting Procedure
Version 3.0 3-1 CP-6 Series PAM Operation