20 – 5 V ersion 7.0 Chapter 20 Memory Board Installation (4) Remove the old battery and install the new one, as shown below . (When ordering a new battery , specify lithium battery ER6-C, 3.6V .) Fig. 20-5 Installing the…

100%1 / 167
Chapter 20 Memory Board Installation
20.3Changing the Memory Board Battery
Follow the steps below to change the memory board battery.
(1) Turn on the power and boot up the machine. Delete all production
programs from machine memory using the MCS “Delete M/C
program” command in the Transmission menu.
Note: Refer to the MCS/2 System Instruction Manual, Part 3, for a
detailed explanation of the “Delete M/C program” command.
(2) Turn the machine power off. Open the control box and put on the
anti-static wristband.
(3) Disconnect the SCSI cable from the memory board and remove the
memory board from the VME rack. Two types of memory boards are
currently in use. The two boards differ only in the position of the
battery. The FSC-30A-02 has the battery mounted on the board
surface, while the FSC-30B has the battery mounted on the rear edge
of the board. (See illustration below.)
FSC-30C FSC-30A-02
Fig. 20-4 Battery Locations
20 – 4
Version 7.0
CP IV-3 Maintenance
20 – 5
Version 7.0
Chapter 20 Memory Board Installation
(4) Remove the old battery and install the new one, as shown below.
(When ordering a new battery, specify lithium battery ER6-C, 3.6V.)
Fig. 20-5 Installing the Battery
(5) Remount the memory board in the VME rack and reconnect the SCSI
cable to the memory board.
(6) Turn on the power and boot up the machine. Carry out zero setting.
(7) Measure camera Proper data or load it from a backup SRAM memory
card.
Note: Refer to section 2.2 for instructions on loading camera Proper data
from SRAM memory card. Be especially careful to carry out the
procedures to confirm that data has loaded successfully. Be sure to
remove the SRAM memory card from the memory board and insert
the original ROM memory card before rebooting the machine.
(8) Turn off the power, then turn it back on and boot up the machine.
(9) Transmit a program from MCS to the machine and measure nozzle
centers.
CP IV-3 Maintenance
Chapter 20 Memory Board Installation
20 – 6
Version 7.0
CP IV-3 Maintenance