00194103-01.pdf - 第50页
2 Operational safety User Manual SIP LACE F5 HM 2.5 Safety equipment Software Version SR.408.xx 03/2006 US Edition 50 2.5.1.1 Gener al The gantry position ing range is covere d by two pr otective cov ers. If you w ant to…

User Manual SIPLACE F5 HM 2 Operational safety
Software Version SR.408.xx 03/2006 US Edition 2.5 Safety equipment
49
2.5 Safety equipment
2.5.1 Protective covers
2
Fig. 2.5 - 1 Safety equipment in the placement machine
(1) Cover and guard on the input belt
(2) Safety panels, right-hand side
(3) Protective cover
(4) Cover and guard on the output conveyor
(5) Protective cover
(6) Safety panels, left-hand side

2 Operational safety User Manual SIPLACE F5 HM
2.5 Safety equipment Software Version SR.408.xx 03/2006 US Edition
50
2.5.1.1 General
The gantry positioning range is covered by two protective covers. If you want to open the protec-
tive covers, first press the Stop button (item 1 in Fig. 2.5 - 2
) or the EMERGENCY STOP button
(item 2 in Fig. 2.5 - 2
). The power to the gantry axes will be switched off and the gantries will stop
immediately. If you open one of the protective covers or a guard on the incoming or outgoing con-
veyor, the power to the gantry axes will be switched off. They will stop immediately. 2
Placement will stop if you press the EMERGENCY STOP button. You can then either cancel or
continue placement of the PCB. The protective covers at the sides can be opened in order to refill
with components when the machine has stopped. 2
WARNING
The protective covers must only be opened, with the key switch closed (position I), by appropri-
ately qualified and trained personnel. 2
Fig. 2.5 - 2 Stop button and EMERGENCY STOP button, key switch
(1) Stop button
(2) EMERGENCY STOP button
(3) Key-operated switch

User Manual SIPLACE F5 HM 2 Operational safety
Software Version SR.408.xx 03/2006 US Edition 2.5 Safety equipment
51
2.5.2 Guard on the input / output belt
WARNING
The guard must always be set to the height of the PCB to be processed. Ensure that the gap be-
tween the guard and the safety bar is as small as possible. 2
Guards are fitted on the input and output belts of the PCB conveyor. 2
The height of the guard must be set using the slots so that the processed PCB can travel through.2
2
Fig. 2.5 - 3 Hand guard on the placement machine
(1) Safety bar (fixed) (2) Guard (adjustable)
(3) Slots for adjusting the height (4) Cover