00191657-0102_UM_Luftkissentransportsystem_DE EN.pdf - 第77页
Air cushion t ransporting system for SIPLACE Operating Instructions 10/99 edition 5.5 Disassembly 35 K Close the ball cock on the ai r hose. : Disconn ect the ai r hose f rom the c ompress ed air sup ply . L Open the mai…

Operating Instructions Air cushion transporting system for SIPLACE
5.5 Disassembly 10/99 edition
34
5.5 Disassembly
1
8
1
9
2
0
21
Air cushion transporting system for SIPLACE Operating Instructions
10/99 edition 5.5 Disassembly
35
K Close the ball cock on the air hose.
: Disconnect the air hose from the compressed air supply.
L Open the main ball cock of the control unit and wait until the hoses and pressure regulators
have discharged.
: Depressurize all the pressure regulators.
: Disconnect all the hoses.
: Clean the air cushions (do not use aggressive cleaning agents).
: Carefully store all the parts.
21
20

Operating Instructions Air cushion transporting system for SIPLACE
5.6 Troubleshooting 10/99 edition
36
5.6 Troubleshooting
5.6.1 Loss of pressure from an air cushion
– Floor not airtight:
Cover the floor with metal sheets or adhesive tape
– Pressure too low when moving over the edge of a metal sheet:
Increase the pressure and/or stick down the edges with adhesive tape.
– Leak from the rubber bellows:
Replace the rubber bellows and send the old one for repair.
5.6.2 Loss of pressure from all the air cushions
: Check the pressure reading on the input manometer:
– If it is less than 5 bar:
Wait until sufficient pressure has built up or
connect a larger air line or
a larger compressed air unit.
– If it is more than 5 bar:
Adjust all the pressure regulators (= increase the pressure in the air cushion)
WARNING 5
: The operating pressure must never exceed the values shown in Tab. 6.1 - 1 and 6.3 - 1.
5
5.6.3 The load rocks:
: Close the main ball cock on the control unit. Then slowly open the main ball cock again until
the pressure has built up once more.