Micron Technical Reference V9 Volume 4.pdf - 第252页
TRANSPORTATION - POWER UP MACHINE POWER UP SEQUENCE 44.8 Technical Reference Manual Chapter Issue 1, Jan 16 MACHINE POWER UP SEQUENCE Apply Systems Power 1. Connect the pneumatic supp ly to the connection on the rear , b…

TRANSPORTATION - POWER UP
PRE POWER UP CHECKS
Chapter Issue 1, Jan 16 Technical Reference Manual 44.7
Preparations 1. Ensure machine mains isolator is OFF.
2. Check and verify that the mains electrical supply is single phase 100V to
240V ±10% at 50/60Hz ac.
3. Check that all circuit breakers are in the ON position.
4. Ensure that all access covers and removable panels are closed and are in
place.
5. Ensure that the E Stop button is in the fully out position. To check this, push
the E Stop button until it latches. Turn the button clockwise to release it.

TRANSPORTATION - POWER UP
MACHINE POWER UP SEQUENCE
44.8 Technical Reference Manual Chapter Issue 1, Jan 16
MACHINE POWER UP SEQUENCE
Apply Systems
Power
1. Connect the pneumatic supply to the connection on the rear, bottom left of
the machine, External Services section of this chapter refers.
2. Connect the mains supply to the machine.
3. Turn the Mains Isolation Switch ON.
4. Select Diagnostics.
5. Ensure that System is highlighted and select Select Module.
6. Select the Previous button once to highlight Terminate Control Program.
7. Select Run Diagnost.
Time and Date In order for the machine PC to log events correctly, the system time, date and
correct time zone must be set.
1. Using the mouse, click on the time, displayed at the right hand side of the
Windows taskbar. The following window is displayed:
2. Click on Change date and time settings...

TRANSPORTATION - POWER UP
MACHINE POWER UP SEQUENCE
Chapter Issue 1, Jan 16 Technical Reference Manual 44.9
3. Click on the Change date and time... button.
4. Select the correct date on the calendar display.
5. Set the correct time on the digital display beneath the clock.
6. Select OK.