CP45FVNEO Maintenance Reference (Eng, Ver3).pdf - 第29页
Pr eventive Maintenance Chapter 1 . Preventive Maintenance 1-1 1.1. Maintenance Procedure(ce model) The following procedures should be performed before doing any maintenance task. 1. Check to see if all the operations of…

Samsung Component Placer CP45NEO Series Maintenance Reference
(Based on CE Machine)
Main Circuit
Breaker
Noise Filter
Refers to an electric device that allows electrical current to flow stably by preventing
any distortion of the current wave generated in the circuit.
F.G(Frame Ground)
Refers to the point at which the machine is grounded.
F.G
xvi

Preventive Maintenance
Chapter 1 . Preventive Maintenance
1-1
1.1. Maintenance Procedure(ce model)
The following procedures should be performed before doing any maintenance task.
1. Check to see if all the operations of the equipment are terminated.
2. Turn off the Isolation Switch.
3. Turn off the Main Circuit Breaker.
4. Perform the maintenance tasks according to the directions explained in the following
sections. .
After completing the maintenance tasks, please follow the procedures outlined below in
order to operate the equipment properly.
1. Check to see if there are any abnormal substances in the maintenance area, and if any,
remove them.
2. Make sure that all the parts are re-assembled properly.
3. Turn on the Main Circuit Breaker.
4. Turn on the power of the equipment according to the procedures mentioned in power
inspection.
5. Confirm that the equipment is operated normally without any problem.
Warning
Please turn off the Main Switch in the right lower cover of
rear side before performing any maintenance related tasks.
Loss of human life may occur if proper safety measures are
not taken.
Main Switch
OFF

Samsung Component Placer CP45NEO Series Maintenance Reference
1.2. Environmental conditions
1.2.1. Requirements for air pressure
Pressure
Primary pressure: 0.5 ~ 0.7 MPa
Secondary pressure: 0.45 ~ 0.55 MPa
Air Consumption: Maximum 160 N ℓ/min
Dry Air: air dew point of -17℃ or less
1.2.2. Power requirements
Voltage
Single phase AC 220 V ±10 %
AC 100 V ±10 % / 110 V±10 % / 120 V±10 % / 200 V±10 % / 220 V±
10 %/ 240 V±10 % (shall be changed the terminal of the transformer)
1-2