W eekly Inspection 3-7 spanner clockwise, and supply air pressure through the connection hose.  Lay a clean cloth at the bottom of the no zzle holder of head 01 and blow out repeatedly by pressing the manual switch of S…

100%1 / 139
Samsung Component Placer CP45NEO Series Maintenance Reference
Main switch turn-of
f
direction
(
counterclockwise)
Block the main pressurized air at the air panel on the rear of the machine.
Caution
Shock caused by pressurization while blocking the
pressurized air may be caused. Please handle with care.
Remove the top cover of the head assembly with a “+” shaped screwdriver.
After removing the pressure gauge on the head assembly air module by turning the
10mm spanner counterclockwise, assemble the elbow fitting by turning the 10mm
3-6
Weekly Inspection
3-7
spanner clockwise, and supply air pressure through the connection hose.
Lay a clean cloth at the bottom of the nozzle holder of head 01 and blow out
repeatedly by pressing the manual switch of So1 ten times.
Blow out head 02 to head 06 in the same way.
According to the state of the impurities collected on the cloth, remove the vacuum
filter and clean or replace it every two months.
Samsung Component Placer CP45NEO Series Maintenance Reference
Assembling is done in the reverse order.
3.1.3. Spindle
Inspection
Contamination (such as solder paste, etc.) in the spindle can cause pickup problems. The
inside of the spindle must be cleaned in case of contamination. Perform the cleaning of
the spindle and vacuum filter at the same time.
Spindle
3-8