10 Machine Performance T y pes of placement head 20-nozzle Collect & Place head (C & P20) 12-nozzle Collect & Place head (C & P12) 6-nozzle Collect & Place head (C & P6) SIPLACE T winHead (TH) PLE…

9
Modular Machine Concept
Example of the SIPLACE X4
NCH2
NCH1
NCH2
NCH1
C&P/TH
X/HF
MTC/X/HF
C&P/TH
NCH2
NCH1
NCH2
NCH1
PA1
PA2
C&P/TH
MTC/X/HF
X/HF
C&P/TH
BZ Buffer zone
C&P Collect&Place head
HF SIPLACE HF compo-
nent changeover table
MTC Matrix Tray Changer
NCH1 Nozzle changer, row 1
NCH2 Nozzle changer, row 2
OP Operator panel
PA1 Placement area 1
PA2 Placement area 2
TH TwinHead
X SIPLACE X component
changeover table
OP
OP
BZ
BZ
BZ

10
Machine Performance
Types of placement
head
20-nozzle Collect&Place head (C&P20)
12-nozzle Collect&Place head (C&P12)
6-nozzle Collect&Place head (C&P6)
SIPLACE TwinHead (TH)
PLEASE NOTE IPC value [comp./h]
According to the vendor-neutral conditions of the IPC 9850 standard pub-
lished by the Association of Connecting Electronics Industries.
SIPLACE Benchmark value [comp./h]
The SIPLACE benchmark value is measured during the machine accep-
tance tests. It corresponds to the conditions set out in the SIPLACE scope of
service and supply.
Theoretical maximum output value [comp./h]
The theoretical maximum output value is calculated from the most favorable
conditions for each machine type and setting, and corresponds to the theo-
retical conditions normally used in the industry.
SIPLACE X4 placement system
Number of gantries 4
Placement area 1 Placement area 2 IPC value Benchmark value Theoretical value
C&P20 / C&P20 C&P20 / C&P20 81,000 90,000 124,000
C&P20 / C&P20 C&P12 / C&P12 65,000 71,400 102,500
C&P20 / C&P20 C&P12 / C&P6 60,300 65,300 94,000
C&P20 / C&P20 C&P12 / TH 57,500 63,800 89,000
C&P20 / C&P20 C&P6 / C&P6 56,900 63,300 85,000
C&P20 / C&P20 C&P6 / TH 53,100 59,400 80,000
C&P20 / C&P20 TH / TH 47,800 52,500 75,000
C&P12 / C&P12 C&P12 / C&P12 49,000 52,800 81,500
C&P12 / C&P12 C&P12 / C&P6 44,300 46,700 72,500
C&P12 / C&P12 C&P12 / TH 41,500 45,200 67,500
C&P12 / C&P12 C&P6 / C&P6 40,900 44,700 64,000
C&P12 / C&P12 C&P6 / TH 37,100 40,800 59,000
C&P12 / C&P12 TH / TH 31,800 33,900 53,500
C&P12 / C&P6 C&P12 / C&P6 39,600 40,600 64,000
C&P12 / C&P6 C&P12 / TH 36,800 39,100 59,000
C&P12 / C&P6 C&P6 / C&P6 36,200 38,600 55,000
C&P12 / C&P6 C&P6 / TH 32,400 34,700 50,000
C&P12 / C&P6 TH / TH 27,100 27,800 45,000
C&P12 / TH C&P12 / TH 34,000 37,600 53,500
C&P12 / TH C&P6 / TH 29,600 33,200 45,000
C&P12 / TH TH / TH 24,300 26,300 40,000
C&P6 / C&P6 C&P6 / C&P6 32,800 36,600 46,000
C&P6 / C&P6 C&P6 / TH 29,000 32,700 41,000
C&P6 / C&P6 TH / TH 23,700 25,800 36,000
C&P6 / TH C&P6 / TH 25,200 28,800 36,000
C&P6 / TH TH / TH 19,900 21,900 31,000
TH / TH TH / TH 14,600 15,000 26,000

11
Machine Performance
SIPLACE X3 placement system
For the placement head configuration and the placement rate see the note on page 10.
Number of gantries 3
Placement area 1 Placement area 2 IPC value Benchmark value Theoretical value
C&P20 / C&P20 C&P20 62,200 69,500 93,000
C&P20 / C&P20 C&P12 53,600 59,000 82,500
C&P20 / C&P20 C&P6 49,200 54,800 73,500
C&P20 / C&P20 TH 44,800 50,000 68,500
C&P12 / C&P12 C&P12 37,600 40,400 61,000
C&P12 / C&P12 C&P6 33,200 36,200 52,500
C&P12 / C&P12 TH 28,800 31,400 47,000
C&P12 / C&P6 C&P6 28,500 30,100 43,500
C&P12 / C&P6 TH 24,100 25,300 38,500
C&P12 / TH TH 21,300 23,800 33,500
C&P6 / C&P6 C&P6 25,100 28,100 34,500
C&P6 / C&P6 TH 20,700 23,300 29,500
C&P6 / TH TH 16,900 19,400 24,500
TH / TH TH 11,600 12,500 19,500
SIPLACE X2 placement system
For the placement head configuration and the placement rate see the note on page 10.
Number of gantries 2
Placement area 1 Placement area 2 IPC value Benchmark value Theoretical value
C&P20 C&P20 43,400 49,000 62,000
C&P20 C&P12 34,800 38,500 51,000
C&P20 C&P6 30,400 34,300 42,500
C&P20 TH 26,000 29,500 37,500
C&P12 C&P12 26,200 28,000 40,500
C&P12 C&P6 21,800 23,800 32,000
C&P12 TH 17,400 19,000 26,500
C&P6 C&P6 17,400 19,600 23,000
C&P6 TH 13,000 14,800 18,000
TH TH 8,600 10,000 13,000