00192324-0302_MM_MTC1-MTC2_EN.pdf - 第15页

Preventive Maintenance MTC 2 Maintenance 10/2010 US Edition 1 MTC 15 1 Y ou will need the consumables for the weekly maintenance: 1 – Soft, lint-free cloths –E t h y l a l c o h o l . 1 1 : S top the placement process of…

100%1 / 48
Maintenance Preventive Maintenance MTC 2
1 MTC 10/2010 US Edition
14
1.6 Weekly maintenance work
1
Preventive Maintenance MTC 2 Maintenance
10/2010 US Edition 1 MTC
15
1
You will need the consumables for the weekly maintenance: 1
Soft, lint-free cloths
–Ethyl alcohol.
1
1
: Stop the placement process of the placement machine.
: Move both tower in the refill positions cassette 1.
: Open the cover and the protective door of the placement machine.
1
1
Cleaning the rails of the feed axis 1
a Clean the WTC contact surfaces on the rails of the feed axis with a lint-free cloth moistened
with ethyl alcohol.
1
Pay attention to the crash light barriers during this process (see illustration on the left). 1
1
1
Cleaning of cassette guide rails 1
s Clean the cassette guide rails (in the control panel behind the safety doors of the MTC) with a
lint-free cloth moistened with ethyl alcohol.
1
1
: Close the cover and the protective door.
: Exit the refill position.
: Press the Start button of the placement machine.
1
1
1
1
1
1
1
Maintenance Preventive Maintenance MTC 2
1 MTC 10/2010 US Edition
16
1.7 Monthly maintenance work
1