00192324-0302_MM_MTC1-MTC2_EN.pdf - 第33页

Preventive Maintenance MTC 2 Maintenance 10/2010 US Edition 2 MTC 2 33 2 Y ou will need the followin g consumables for the weekly mainte nance : 2 – Lint-free c loths – Ethyl alcohol 2 2 : S top the placement process of …

100%1 / 48
Maintenance Preventive Maintenance MTC 2
2 MTC 2 10/2010 US Edition
32
2.6 Weekly maintenance work
2
1
2
Preventive Maintenance MTC 2 Maintenance
10/2010 US Edition 2 MTC 2
33
2
You will need the following consumables for the weekly maintenance: 2
Lint-free cloths
Ethyl alcohol
2
2
: Stop the placement process of the placement machine.
: Move both towers in the refill position cassette 1 using the MTC menu.
: Open the protective cover.of the placement machine.
2
2
Cleaning the rails of the feed axis 2
a Clean the WTC contact surfaces on the rails of the feed axis with a lint-free cloth moistened
with ethyl alcohol.
2
2
Pay attention to the crash light barriers in the process (see illustration on the left). 2
2
2
Cleaning of cassette guide rails 2
s Clean the cassette guide rails (in the control panel behind the safety doors of the MTC) with a
lint-free cloth moistened with ethyl alcohol.
2
2
: Close the protective cover.
: Exit the refilling position.
: Press the Start button.
2
2
Maintenance Preventive Maintenance MTC 2
2 MTC 2 10/2010 US Edition
34
2.7 Bi-monthly maintenance work
2
2
1
1
5
5
3
4
2
4
2
1
1
f Leaf springs
g Interlock WT
a Interlock WTC s Top view to leaf springs
a Handle
s Handle sleeve
d Reinforcing strips
1
2